Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Determine the node voltage by using KCL:
Determine the node voltage V and then current flowing through each element by using KCL.
Solution
Apply KCL at the node whose voltage is V.
Algebraic summation of all the current meeting at node is zero.
(V - 10) /I+ V/I + V /4 = 0
V [1 + 1 +(1/4)] = 10
2.25 V = 10
V = 4.44 volt.
Now we have to determine current through each element.
I1 = 10 - V / 1 = 10 - 4.44 = 5.56 Amp
I1 = V/1 = 4.44 Amp
I2 =V/4 = 1.11 Amp .
if the shunt motor has reduce as half load then what effect on speed
Let the message signal m(t) = α cos (2πf m t) be used to either frequency-modulate or phase- modulate the carrier Ac cos(2πf c t). Find the modulated signal in each case.
Consider the circuit shown in Figure (a) in which the switch S has been in position 1 for a long time. Let the switch be changed instantaneously to position 2 at t = 0. Obtain v(t)
Differentiate between synchronous and asynchronous types of serial communication. Serial data communication uses two fundamental types as, synchronous and asynchronous. With
Q. A 25-kVA, 2400/240-V, 60-Hz, single-phase transformer has an equivalent series impedance of 3.45 + j5.75 referred to the primary high voltage side. The core loss is 120 W. Whe
register array?
An induction motor has a starting current that is 6 times the full-load current and a per-unit full- load slip of 0.04. The machine is to be provided with an autotransformer starte
What is TPA (transient program area)? The memory system is divided in three major parts: transient program area, System is and XMS that is extended memory system.
Calculate the following for a 2 hp and a 20 hp dc machine, each rated for 500 rpm. Use data from the Study Plan 1 data sheet, including "hot" armature resistance value for all cal
Calculate the monthly electric bill for TESTU. Metering is as follows: B 00,000 kWHr C 00,000 kVARHr D 0,000 kW peak demand Facilities Charge = $500
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd