Determine the head loss due to friction using the Darcy-Weisbach equation. The water is pumped at 3.0 gallons per minute, has a temperature of 60 °F and is pumped through a 1inch schedule-40 steel pipe. The equivalent length of the piping and minor losses is 258 ft.

 Steps to solve for the Reynolds Number:  

What is the pipe internal diameter?    0.0874 ft

 What is the pipe internal area?    0.00600 ft2

 What is the velocity of the water flowing in the pipe?    1.11 ft/sec  

(3.0gpm)(0.002228 cƒs/gpm) 0.00600 ƒt2   

What is the kinematic viscosity?   1.27 × 10-5 ƒt2 /sec 

 Calculate the Reynolds Number:   8.0 × 103

 (0.0874 ƒt)(1.11ƒt /sec) / 1.217 × 10-5 ⁄ ƒt2 sec

 Steps to solve for the Relative Roughness:

 What is the Specific Roughness of the pipe material?   0.0002

 What is the pipe internal diameter?   0.0874 ft

 Calculate the Relative Roughness:   0.0002/0.0874 ft = 0.00228

 Steps to solve for the friction factor "f": 0.0354 to 0.0361

 Apply the Relative Roughness and Reynolds Number to the Moody Diagram or

Darcy Friction Factor table

Calculate the head loss due to friction using the Darcy equation: hƒ = ƒLv2/2Dg

(0.0354)(258 ƒt)(1.11 ƒt /sec)2 /2(0.0874 ƒt)(32.2 ????/sec2) = 2.0 ƒt

(0.0361)(258 ƒt) (1.11 ƒt /sec)2 /2(0.0874 ƒt)(32.2 ƒt /sec2) = 2.04 ƒt 

 


Related Discussions:- Determine the head loss due to friction

Obstacle measurement.., ..describe how u can obtain the length of an inacce...

..describe how u can obtain the length of an inacceble length of a land when a river cross it

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Determine the grade rod reading at station, A section view of a proposed ro...

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft

Grades of concrete, mixing ratio of different type of ready mix concrete.(R...

mixing ratio of different type of ready mix concrete.(RMC)

What do you mean by ggbs – cement replacement, Q. What do you mean by GGBS ...

Q. What do you mean by GGBS – cement replacement? From structural point of view GGBS replacement enhances higher durability, lower heat of hydration and higher resistance to su

Disparities between regular precast and pipe jacking, Question What are...

Question What are main disparities in design between regular precast concrete pipes and pipes used for pipe jacking ? Answer For pipes used for pipe jacking, they h

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd