Determine the head added by the pump, Civil Engineering

Assignment Help:

Primary effluent wastewater at 60oF (v = 1.217 x 10-5) is pumped to the top of a trickling filter (TF) a total of 75 vertical feet through schedule-40 welded steel pipe. The flow rate is 8.64 mgd (6,000 gpm). The suction piping is 24 in diameter straight piping (velocity of 4.8 fps), has a length of 10 ft and an energy loss of 0.03 ft. The discharge piping is 18 inch diameter (velocity of 8.6 fps), has a length of 177 ft and an energy loss of 3.6 ft. The total length of the suction and discharge piping is 187 ft. Minor losses exist in the discharge piping only and total an equivalent length of 137 ft. The wet well and TF distribution arms are open to the atmosphere. The pump efficiency is 85%. 1.  Determine the head added by the pump hA:

1. Determine the head added by the pump hA:

hA = (PD/γ - PS/ γ) + ( v2 D/2g - v2 S/2g) + ZD - ZS + hf ZD - ZS = 75 ft

v2 dis/2g = (8.6) 2 /64.4 = 1.15 ft v2 suc/2g = (4.8) 2 /64.4 = 0.35 ft

total hf = 0.03 ft + 3.6 ft = 3.62 ft

hA = 0 + (1.15 ft - 0.35 ft) + 75 ft + 3.62 ft = 79.4 ft

2.  Determine the hydraulic horsepower required:   

whp = hAQ(sp gr)/3956=((79.4 ft)(6000 gpm)(1))/3956 = 120 HP

3.  Determine the brake horsepower required:

bhp = whp/pump efficiency = 120 HP / 0.85 = 142 HP

4.  The friction or heat horsepower is

bhp-whp = 142 HP - 120 Hp = 22 HP


Related Discussions:- Determine the head added by the pump

Foundation, what are factors that affect bearing capacity of a shallow foot...

what are factors that affect bearing capacity of a shallow footing

Defaults for precast concrete pipes made by spinning, Q. Defaults for preca...

Q. Defaults for precast concrete pipes made by spinning? Small diameter precast concrete pipes are generally manufactured by spinning method. The spinning method fundamentally

# bnm.l/j, what does oxymoron mean

what does oxymoron mean

Application of levelling, how do I draw sections(longitudinal and cross sec...

how do I draw sections(longitudinal and cross sections)?

Calculate the total board feet, A project engineer has ordered 100 hardwood...

A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long.  The total board feet ordered is most nearly:  Solution: 1.25" x 8" x 8' x 100

Illustrate bituminous surfacing over concrete structures, Q. Illustrate Bit...

Q. Illustrate Bituminous surfacing over concrete structures? Usage of bituminous surfacing over concrete structures (for instance existing concrete roads) is widespread to impr

What is rail lubrication, Q. What is Rail Lubrication? Rail Lubrication...

Q. What is Rail Lubrication? Rail Lubrication is done on sharp curves where lateral wear is considerable. The function of Rail Lubrication is to lubricate or oil the running fa

Principles and Practices of Management, How Will You Influence People to St...

How Will You Influence People to Strive Willingly for Group Objectives in Your Organization (Target Based Industry)? Apply Your Interpersonal Influence Through Communication Proces

Bridge engineering, How to calculate economic span of ss bridge

How to calculate economic span of ss bridge

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd