Determine the Depth of Exploration
The depth of exploration depends on the following factors:
i) Size, type of the structure and loading intensity.
ii) Design considerations such as safety against foundation failure, seepage, earth pressure, excessive settlement.
iii) Character and sequence of sub-soil conditions.
The bore hole/boring must penetrate through all the deposits which are not suitable for foundation. In other words, the bore hole should extend upto strata, which is of adequate bearing capacity. You can use the geophysical profile to estimate the depth of boring.
In the absence of geophysical profile the depth of boring can also be estimated based on stress distribution criteria. This must include all the strata which are likely to undergo settlements due to load of the structure. This depth is called significant depth. De Beer recommends that the increase in stresses at the needed minimum depth of exploration should not exceed by 10% of the original vertical stress or less than 5% of the effective stress in the soil at this depth.
You must always keep in the mind that this significant depth will not account for coefficient of compressibility of the strata.
Purpose of embedding puddle flange inside the walls of closed valve chambers When valves are closed to stop water flow in a pipeline, a thrust is produced along the direction o
Q. What do you mean by Stock Verification Sheets? The proper custody and accountal of stores is the prime duty and function of an executive or the stockholder. To ensure this v
the cooke''s reversible level
Define the Planning an Underwater Inspection? Planning for underwater inspection is important because of - Unknown factors which may be discovered during the diving - Th
Determine the moment of inertia with respect to the x axis for the shaded area shown (Figure 2) . The dimension is a = 2.00m
whatiscreepofmetal&typesdescribe
chlorosis in plants is caused by
Stone Soling: One of the early practices in road construction was to provide a stone soling 150-225 mm in thickness. The stones are laid by manual labour, and stone spalls ar
Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?
Determine elongation because of self weight of bar:
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd