Determine the co-ordinates of grain-size distribution curve, Civil Engineering

Assignment Help:

In a hydrometer analysis, 0.5 N of soil was mixed in water to form one litre of uniform suspen- sion. The corrected hydrometer reading after a lapse of 60 min. from the start of sedimentation was 1.010, and the corresponding effective depth was 10.8 cm. The grain specific gravity was 2.72. Assuming the viscosity of water as 0.001 N-sec/m2 and the unit weight of water as 9.8 kN/m3, determine the co-ordinates of the corresponding point on the grain-size distribution curve.


Related Discussions:- Determine the co-ordinates of grain-size distribution curve

Use pot bearings instead of elastomeric bearings, Question Under which ...

Question Under which situation ought to engineers use pot bearings instead of elastomeric bearings ? Answer In an event of high vertical loads shared with large angl

Determine the total stopping sight distance in feet, Determine the total St...

Determine the total Stopping Sight Distance in feet A motorist is travelling down a 6% grade at 65 mph and needs to stop because of a crash scene.  Assuming a 2.0 sec PRT and 1

Work, Grouted or Penetration Macadam:

Grouted or Penetration Macadam:

Stone, STONE Stone is a 'naturally available building material' used fr...

STONE Stone is a 'naturally available building material' used from the early age of civilization. It is available in the form of rocks, which is cut to needed size and shape an

Rectangular tie, how to perform a rectangular tie using optical square?

how to perform a rectangular tie using optical square?

Show the settlement due to excavation, Q. Show the Settlement due to Excava...

Q. Show the Settlement due to Excavation? If  an excavation is made in a sandy soil,  the structure founded near the excavation will be affected and it will cause extra settlem

Statics - SFD & BMD Calculations, Could someone please help me with the cal...

Could someone please help me with the calculations of determining the sfd & bmd for cantilevers with udl''s, lvl''s and point loads? Also could I please have the same for ssb with

Construction of concrete carriageway, Question If construction of conc...

Question If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted? Answer If construction of concrete carriageway

Railway bridge, how to measure the waterways of railway bridges

how to measure the waterways of railway bridges

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd