Determine the basic concepts of prestressing, Civil Engineering

Assignment Help:

Determine the Basic Concepts  of Prestressing

In the year 1904, Freyssinet tried to introduce prestresses in concrete to resist stresses developed due to external loads. Later, the concept of prestressing was formulated by Doehring of Germany and Jackson of United States. Mandl and Koenen were the first ones to propose a theory for modelling the behaviour of prestressed members to perform design. Notable work was done by M. Koenen and Steiner in the area of  losses of prestress in prestressed members. Dischinger demonstrated the use of unbonded tendons in  the year 1928 in the construction of a bridge. The first major use of prestressing in civil infrastructure in the United States was the construction of the Walnut Lane Bridge in Philadelphia in the year 1950. In the last many decades, prestressed concrete has been widely used  in the construction of  long span bridges, railway sleepers, shell roofs, marine structures, nuclear pressure vessels, water retaining structures, transmission towers and many other structures.

 

 


Related Discussions:- Determine the basic concepts of prestressing

Choosing between trailer suction hopper and grab dredgers, Question In ...

Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

Digit of cells for concrete box girder bridges, Question How does an engine...

Question How does an engineer determine digit of cells for concrete box girder bridges ? Answer If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is o

Foundation, what are factors that affect bearing capacity of a shallow foot...

what are factors that affect bearing capacity of a shallow footing

Mechanism of formation of soil plugs, Question What is main mechanism o...

Question What is main mechanism of formation of soil plugs in marine driven steel piles with reinforced concrete infill? Answer Throughout initial driving process, ope

#title Design a gravity-flow sanitary sewer , i have to Design a gravity-f...

i have to Design a gravity-flow sanitary sewer to serve and i need it to be done asap

Building plan, the conventional symbol used in building plan

the conventional symbol used in building plan

Pre-stressing work, Under which situation shall engineers use jacking in ag...

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Commercial building, i) Describe the general significant of energy performa...

i) Describe the general significant of energy performance in industrial or commercial buildings.  ii) Draw the building layout and produce an overall description that will have

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd