Determine the average time in the queue, Mechanical Engineering

Assignment Help:

A machine machines parts in exactly 1.5 minutes. The machine requires tool change according to an exponential distribution with a mean of 12 minutes between occurrences. The tool change time is also exponentially distributed  with a mean of 3 minutes.  Parts arrive for processing exactly every 2 minutes. 

Simulate the system for 10 hours. Determine the average time in the queue before the machine for three cases as follows (focus: breakdowns):

a.  Take randomness into account as stated above.

b.  Ignore the randomness (treat the breakdown data as deterministic).

c.  Assume that the machine has no breakdown, but that the processing time is 1.875 minutes.


Related Discussions:- Determine the average time in the queue

Magnitude and direction of force, Magnitude and direction of force: D...

Magnitude and direction of force: Determine magnitude and direction of smallest force P which is required to start the wheel over the block. As shown in the figure. So

Shielded metal arc welding, Shielded Metal Arc Welding   Single pass...

Shielded Metal Arc Welding   Single pass fillet welds upto ¼" (6.4 mm) maximum and ¼" groove welds made with a single pass or a single pass each side, may be made by using a

Metals and melting practices - ladle, Metals and Melting Practices - Ladle,...

Metals and Melting Practices - Ladle, Limestone,Ore,Sinter Ladle : A big bucket utilized as a carrier for molten metal. Limestone : A Blast Furnace raw material that elimi

#title.wedge friction, explain wedge friction?with simple example? solve an...

explain wedge friction?with simple example? solve any simple problem in wedge friction

Explain armature core and armature winding - dc generator, Armature core an...

Armature core and armature winding  Armature is the rotating part of the machine. It is cylindrical in shape with slots on its outer periphery. It houses the armature conducto

Determining the number of kanban card sets, Determining the Number of Kanba...

Determining the Number of Kanban Card Sets: Example: Determining the Number of Kanban Card Sets X automotive, a company that makes muffler assemblies for the Mangalore Mo

Find out the centroid of the shaded area, Find out the centroid of the shad...

Find out the centroid of the shaded : Find out the centroid of the shaded area shown in Figure Solution Net area of shaded portion of Figure = The area of full

What is value engineering, Value engineering & Value analysis VA may b...

Value engineering & Value analysis VA may be defined as looking at an existing product or a product already in production to see if changes in design or process can reduce prod

Communication, is effective commucation an intergral aspect in the mecheni...

is effective commucation an intergral aspect in the mechenical engineering field?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd