Determine the amount of excavated material, Civil Engineering

Assignment Help:

The footprint of a proposed office building is overlaid on the existing contours topographic map of a sloping site as shown in the figure. The structural bays which are 65-ft by 65-ft. Determine the amount of excavated material (yd3) to bring the footprint to the sub-grade elevation of 57-ft.


Related Discussions:- Determine the amount of excavated material

Need survey paper, Write a Survey Paper: Write between 7 to 10 pages a...

Write a Survey Paper: Write between 7 to 10 pages a survey paper in one of the following topic :  ( The Future of HCI. )  For the paper the font size should be 12 points

Premix road, plz tell me the ratio of sand,aggregate,and asphalt.pl tell me...

plz tell me the ratio of sand,aggregate,and asphalt.pl tell me the mm of aggregate

Acidity and alkalinity - chemical characteristics of water, Acidity and Alk...

Acidity and Alkalinity - Chemical Characteristics of Water Acidity: Capacity to neutralize bases and is a measure of acids in water. Acidity is measured by titrating the s

Handheld inspection tool for underwater inspection of bridge, Explain Handh...

Explain Handheld Inspection tools for Underwater Inspection of Bridge? Handheld tools such as flash lights, rulers, and tape measures for documenting areas; small or large hamm

Concrete structural members tensile stresses, Concrete structural members t...

Concrete structural members tensile stresses In concrete structural members tensile stresses act in a longitudinal direction. This is why, stretched tendons (hereafter, called

NERNST EQUATION, HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC

HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd