Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Determine Length of guide bunds?Length of a guide bund has to be such that the flow approaching even from behind the guide bund would pass through the bridge with minimum obliquity ensuring optimum utilisation of waterway. Length has also to be adequate to keep worst embayment of the river at the back of the guide bund away from the approach bank at a safe distance.In addition, bend flow analogy is relevant in this case. The analogy of flow, downstream of a curved channel indicated suggests that flow distribution within guide bunds would become more uniform if radius of curved head is increased rather than increasing the length of the guide bunds as was exemplified by the left guide bund of the Kosi barrage.
evaluate limsin3theta over theta
Water Bound Macadam: Water Bound Macadam (WBM) is a dense and compact course of a road pavement composed of stone aggregates held together by a film consisting of gravel or s
hello
Scenario You are working as a structural technician and have been charged with a range of jobs involving analysis and design of a number of structural members. Task 1 a)
The Morison equation vs. diffraction analysis in determining wave force on piles The choice between Morison's equation and diffraction analysis in determining the wave forces o
what are the diff.types of levels used in levling
A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts space
rectangular grid method for representing contours
Define the Net Positive Suction Head All values in the equations are in units of feet. Note: Only use values related to the suction side of the pump. NPSHR = Net Posi
Immersed tube method for underwater crossing includes the following basic construction steps: (i) Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd