The survey has identified the beginning and ending points along an urban arterial highway that require new sidewalks. The first station is located at 5+88 and the second station is located at 10+05. What is the difference in length between stations in feet and in stations?


Related Discussions:- Determine difference between stations in feet and in station

How to construct a reinforced concrete foundation, A clay layer 24 metres t...

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m 3 . Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundati

Structural dynamics, A machine of 850 kg mass is acted upon by an external ...

A machine of 850 kg mass is acted upon by an external force of 1355 N at a frequency of 650 rpm. To reduce the effects of vibrations on the supporting structure, isolators having s

Proctor test for GSB material, what is the procedure for gsb proctor test f...

what is the procedure for gsb proctor test for matrial sampling for lab density

Float or slack of an activity is positive or negetive, 1. What take place w...

1. What take place when float or slack of an activity is positive Ans: It represents a situation where extra resources are available and the completion of the project is not de

Ships stress, brief detail about ships stresses

brief detail about ships stresses

Mechanics of structure, distinush between determinant and indeterminant pla...

distinush between determinant and indeterminant plane trusses

Define the vapor pressure, Define the Vapor Pressure The partial pressu...

Define the Vapor Pressure The partial pressure exerted at the surface of a liquid at the liquid/vapor interface. The liquid molecules are released into the vapor phase when the

Determine condition of activity in the network flow diagram, Determine the ...

Determine the condition of each activity in the network flow diagram shown below   Ans: a. Activity C can be started only after the completion of activities A and

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd