Determine the condition of each activity in the network flow diagram shown below
Ans:
a. Activity C can be started only after the completion of activities A and B
b. Activity D can be started only activity B is completed
c. Activity E can be started only when activities A, B, C and D have been completed
Ask question #MiAAAAnimum 100 wordAs accepted#
Importance of Tendons in post-tensioned members Tendons in post-tensioned members are subjected to different amounts of stresses (among themselves) due to following reasons.
Distortion energy theory: Let us now consider the solid shown in Figure. (a) By inspection we may see that the solid is safe according to principal stress theor
Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir
Describe the different types of Ant proof courses
types of staircases.
Q. Determine Length of guide bunds? Length of a guide bund has to be such that the flow approaching even from behind the guide bund would pass through the bridge with minimum obl
How to prepare rapid sand filter autocad drawing
What is WBM road. How it is constructed?
Could someone please help me understand the basics of bridge designing
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd