Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Define unit hydrograph - hydrology, Define Unit Hydrograph UNIT HYDROGR...

Define Unit Hydrograph UNIT HYDROGRAPH: The hydrograph developed for a drainage basin (watershed) from the runoff of a 1 in or 1 cm storm. It is the base hydrograph from which

#title.long span truss design, what are the step by step process of designi...

what are the step by step process of designing steel long span trusses?

Drawing, parabola by offset method

parabola by offset method

What will be the increase in horizontal thrust, A 9 metre high retaining wa...

A 9 metre high retaining wall retains a soil with the following properties: φ = 36°; γ = 18 kN/m 3 . What will be the enhance in horizontal thrust if the soil slopes up from the

Timber design, design of timber in flexural members in terms of extreme fib...

design of timber in flexural members in terms of extreme fibre stress in bending, maximum horizontal shear stress, deflection and bearing stress perpendicular to the grain. the ful

Show the stresses during pile driving, Q. Show the Stresses during pile dri...

Q. Show the Stresses during pile driving? Stresses during pile driving In pile driving operation, proper selection of piling hammers is necessary to prevent the damage of

Velocity distribution and flow formulae, Q. Velocity distribution and flow ...

Q. Velocity distribution and flow formulae? Variation in velocity along a vertical in channel cross section is known to follow logarithmic distribution, maximum velocity being

Masonry, Sketches for English bond, Stretcher bond, Header bond, Flemish bo...

Sketches for English bond, Stretcher bond, Header bond, Flemish bond in first & second layer plan, elevation and 3 dimensional view of brick bond.

Describe about the baur-leonhardt system, Describe about the Baur-Leonhardt...

Describe about the Baur-Leonhardt system The Baur-Leonhardt system is included in the third type of anchorages which work under the principle of looping tendon wires at the en

Importance of geotextiles and sand in reclamation works, Question What ...

Question What is main importance of geotextiles and sand in reclamation works? Answer For geotextiles used in recovery, they serve mainly subsequent two purposes

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd