While designing of pipe jacking, what particular areas on pipe joints have to engineers make sure of?


Answer

While in pipe jacking, jacked pipes may well hardly be jacked in designed level and alignment and a number of deviation from original one is commonly adequate provided that deviation are within tolerance of Contract. Though, in order to let alone damage made to pipe joints due to overstressing, it is essential to estimate stress concentrations resulting from these pointed deflections.

 

 


Related Discussions:- Designing of pipe jacking

Aluminium sliding window detail drawings, what are the details of aluminium...

what are the details of aluminium sections and how are they connected for making a door or window

Manufacturing technique of ferro cement, what are the manufacturing techniq...

what are the manufacturing techniques of ferro cement?

Determine the thermal stress in the bar, Determine the thermal stress in th...

Determine the thermal stress in the bar: A stepped bar made of aluminum is held between two supports. The bar is 900 mm in length at 38ºC, 600 mm of which is having a diameter

Brigdes, infomation about differnt brigdes

infomation about differnt brigdes

Leveling., what is the errors faced in leveling

what is the errors faced in leveling

Compare the values of active and passive earth pressures, A retaining wall ...

A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo

Plastic, what is plastic?its types and composition and its uses as engineer...

what is plastic?its types and composition and its uses as engineering material

Rcc lintel, how to make a leakproof joint with existing lintel

how to make a leakproof joint with existing lintel

Edge piles take up more loads than central piles, Edge piles take up more l...

Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd