Design volume of the aeration basin - sewer construction, Civil Engineering

Assignment Help:

Design volume of the aeration basin - sewer construction:

Problem:

What is the design volume of the aeration basin?

Solution

Assuming that 30% of the plant influent BOD5 is removed during primary sedimentation, this means that So = 444 mg/l × 0.70 = 310 mg/l.

Qc = 1/t

Thus  1/Qc = [(Q0×Y)/(V×X)(S0 - S)] -kd

¼ = [days]=33.75×106 [-1/d]× 55/100[g/g]×(310[mg/l]-2 [mg/l])

V[l]×4300[mg/l]-0.05[1/day]

Solving for V, we get V = 5007558 l = 5,00,000 l.


Related Discussions:- Design volume of the aeration basin - sewer construction

Explain the difference in elevation between bm and tp2, Based on the inform...

Based on the information provided in Figure, the difference in elevation between BM and TP 2 is most nearly: Solution: Set up a Table as shown below and insert the kno

Foundation, classification of foundation

classification of foundation

Determine the maximum pressure at the base of the wall, A masonry retaining...

A masonry retaining wall of trapezoidal section with the vertical face on the earth side is 1.5 m wide at the top and 3.5 m wide at the base and is 5.0 m high. It retains a sand fi

Civil, vcdjvoidj pirioi oique

vcdjvoidj pirioi oique

Wires in gabion walls, Gabions are wire mesh boxes that are filled with sto...

Gabions are wire mesh boxes that are filled with stones and they areplaced in an orderly pattern to act as a single gravity retaining wall. Meshes or Lacing wires are designed t

Classification of timber based on modulus of elasticity, Classification Bas...

Classification Based on Modulus of Elasticity: Young's modulus is resolute by conducting bending test. On this basis timber is classified as following: Group A: E = 12.5 kN

Calculate time taken for consolidation in actual layer, A clay layer 5 m th...

A clay layer 5 m thick has double drainage. It was consolidated under a load of 127.5 kN/m2. The load is enhanced to 197.5 kN/m 2 . The coefficient of volume compressibility is 5.7

Cross sectional area to be excavate for roadway construction, The Table pro...

The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd 3 ) between section 83+65.6 and 85+98.5 is most n

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd