Q. Design Transfer Facilities in plant?

Transfer facilities (e.g. pumps, piping, and conveyers) must be arranged so that no leaks can escape the confines of the bund / dike, and so that the equipment will still operate when the bund / dike is full of liquid. Wherever possible, all pipework and conveyors should go over the bund / dike walls, not through  them. Any piping penetrating bund / dike walls must be sealed to prevent leakage. All valves, filters, sight gauges, vent pipes and other ancillary equipment should be situated within the bund / dike and arranged so that discharges are contained.

All pipework should be sited above ground and properly supported to make inspection and repair easier. Fill pipes, draw-off pipes and vent pipes should be positioned away from vehicle traffic to avoid collision damage.


Related Discussions:- Design transfer facilities in plant

Complete outer clutch lugs for deep cuts, Complete outer clutch lugs for de...

Complete outer clutch lugs for deep cuts : Visually check for any deep cuts formed on the outer complete clutch lugs.

Explain the function of the foundation, Explain the function of the foundat...

Explain the function of the foundation The function of the foundation is to ensure that the loads on the super structure are transmitted to the soil below the foundation withou

Split queue rules-priority rules-conventional priority rules, Split Queue R...

Split Queue Rules SPT*   Two queues prioritized as per to SPT. The operations for that t sj - u is negative form a high priority queue that is processed first. The order insid

Can you illustrate sea coal, Q. Can you illustrate Sea Coal? Sea coal o...

Q. Can you illustrate Sea Coal? Sea coal or coal dust is finely ground soft coal (pulverized coal). It is added to moulding sand used to make ferrous castings. It tends to obta

Necessity of suspension system , Necessity of Suspension System No...

Necessity of Suspension System Not to transmit road shocks to the motorcycle components. To guard the driver from road shocks and to make sure the stability of the ve

Estimate elevator algorithm-closest cylinder next, Disk requests come in to...

Disk requests come in to the disk driver for cylinders 10, 22, 20, 2, 40, 6, and 38, in that order. A seek takes 6 mes per cylinder moved. How much seek time is needed for (a) F

Determine the efficiency of bell coleman cycle, (a) Derive a mathematical e...

(a) Derive a mathematical expression to determine the efficiency of Bell Coleman Cycle. (b) A dense air refrigeration cycle acts between pressures of 4 bar and 16 bar. The air t

Determine the number of bolts required, The following specification is used...

The following specification is used for the design of a flanged coupling between two coaxial shafts: Speed: 650rpm Power transmitted: 550 kW Bolt Diameter: 12 mm Pit

Master production schedule, Master Production Schedule: A manufacturin...

Master Production Schedule: A manufacturing unit produces two products M and N on generates to stock basis. The estimated demand for the product M and N over the next six week

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd