QuestionWhy is it best to design storm water drains to match soffit?
AnswerStorm water drains gather storm water in their corresponding catchment areas throughout rainstorm and express collected water through outlets to sea. So, in considering hydraulic designing of storm water drains, previous than regular drainage pipe ability to be taken into consideration, one have to check backwater effect due to tidal condition at outlets if drains are situated quite close to downstream end of outlets. Storm water drains are usually calculated to match soffit to keep away from surcharging by backwater result or when downstream pipes are organization full. Usually pipe size increase from upstream to downstream. For in case of matching drain invert, while outlet pipes are fully surcharged by tidal effect of sea or while downstream pipes are fully filled with storm water, pipe sections right away upstream of outlet are as well surcharged .though, for in case of matching pipe soffit, immediate upstream sections of outlet pipes are not entirely surcharged although downstream pipes are running full. But, it is not always practical to uphold soffit for all pipelines since it requires enough drop to achieve this.
Furthermore, flow of storm water is mostly by gravity in plan of storm water drains. In case drains are designed to equal invert, next it stands a high prospect that flow in upstream smaller pipes has to be free next to a head.
what is brick masonry
define distribution factor and shape factor
write a c program To compute interior angles and correct them for observational errors and adjusting the bearing of remaining sides when the bearings taken on a closed compass trav
Importance of racking load for a pre-stressed concrete beam Evaluation of cracking load for a pre-stressed concrete beam member is important for the following cases/reasons.
what''s a distomat?
California Bearing Ratio (CBR): The most widely used test for determining the supporting power of a soil for designing the thickness of pavements is the California Bearing Ra
select three materials metal and non mealat at least one of the selected materials shold change its property
Measurement of cement and aggregates - by weight vs. by volume Measurement of constituents for concrete is usually carried out by weight since of the following reasons: (i)
derivation for strain energy stored in a body due to torsion
The loading period for a building extended from Feb., 1957 to Feb., 1959. In Feb., 1962, the average measured settlement was found to be 117 mm. The ultimate settlement was expecte
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd