QuestionWhy is it best to design storm water drains to match soffit?
AnswerStorm water drains gather storm water in their corresponding catchment areas throughout rainstorm and express collected water through outlets to sea. So, in considering hydraulic designing of storm water drains, previous than regular drainage pipe ability to be taken into consideration, one have to check backwater effect due to tidal condition at outlets if drains are situated quite close to downstream end of outlets. Storm water drains are usually calculated to match soffit to keep away from surcharging by backwater result or when downstream pipes are organization full. Usually pipe size increase from upstream to downstream. For in case of matching drain invert, while outlet pipes are fully surcharged by tidal effect of sea or while downstream pipes are fully filled with storm water, pipe sections right away upstream of outlet are as well surcharged .though, for in case of matching pipe soffit, immediate upstream sections of outlet pipes are not entirely surcharged although downstream pipes are running full. But, it is not always practical to uphold soffit for all pipelines since it requires enough drop to achieve this.
Furthermore, flow of storm water is mostly by gravity in plan of storm water drains. In case drains are designed to equal invert, next it stands a high prospect that flow in upstream smaller pipes has to be free next to a head.
Figures (a) and (b) respectively give details of a simply-supported bridge beam and its (idealised) cross-section. In addition to the dead load of 25 kN/m (including self weight),
Use of Admixtures in Concrete The use of chemical admixtures may be made in prestressed concrete construction. But the admixture should not contain chlorides in any form. This
Q. Show the Settlement due to Excavation? If an excavation is made in a sandy soil, the structure founded near the excavation will be affected and it will cause extra settlem
why is weight of raft not considered in structural design of raft and beam
Introdaction , volume batching , weighat batching , mesaring of water
Define Problems in turbid water - underwater inspection of bridge? There are three main problems, which limit the viewing performance of an underwater camera. These are: -
how can i get results of this
Explain briefly physical classifications of stone
Limitations of trabsmibilty of forces
An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-mo
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd