Design of work systems, Operation Management

Assignment Help:
A worker machine operation was found to involve 3.5 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The workers time averaged 2.3 minutes per cycle and the worker was given a rating of 120 percent(machine rating is 100 percent). Mid way through the study, the worker too a 10 minute rest break. Assuming an allowance factor of 11 percent of work time, determine the standard time for this job course not round intermediate calculation. Round your final answer to 2 decimal places.

Related Discussions:- Design of work systems

Explain will any action notices be generated, The MPS for product A calls f...

The MPS for product A calls for 100 units to be completed in week 4 and 200 units in week 7 (the lead time is 1 week). Spare part demand for Item B is 10 units per week. The bill o

Explain companies doing acquisitions and mergers in future, Based on your r...

Based on your research of the United and Continental Airline merger, evaluate the challenges experienced during the merger and the resulting impact to the business. Assess the effe

Describe the risks associated with levelling resources, Explain the risks a...

Explain the risks associated with levelling resources, compressing or crashing projects, and imposed durations, or catch-up, as the project is being implemented.

Explain bank is insisting on an improved profit picture, Company A finds pr...

Company A finds profit at $15,000 inadequate for expanding business. The bank is insisting on an improved profit picture prior to approval of a loan for some new equipment. Company

Explain straight-line depreciation, The expected average rate of return for...

The expected average rate of return for a proposed investment of $500,000 in a fixed asset with a useful life of four years, straight-line depreciation, no residual value, and an e

Explain what is the annual number of orders, Office Supreme, Inc., a local ...

Office Supreme, Inc., a local retailer of office supplies, faces demand for one of its inventory items at a constant rate of 240,000 units per year. It costs Office Supreme $38 to

Explain medical facility does mris for sports injuries, A medical facility ...

A medical facility does MRIs for sports injuries. Occasionally a test yields inconclusive results and must be repeated. Using the following sample data and n = 195. SAMPLE 1 2 3 4

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd