Design control room for plant, Mechanical Engineering

Assignment Help:

Q. Design Control Room for plant?

Some equipment may need to be located inside buildings, but this needs to be justified as it incurs additional cost and can create additional hazards. Typically, buildings are used where the process, equipment, materials or activities are sensitive to exposure of various kinds (e.g. heat, cold, moisture, contamination, damage, or noise).

Since ventilation in a building is generally less than that outdoors, a leak of flammable or toxic material tends to disperse more slowly and a hazardous concentration is more likely to build up. Also, if an explosion occurs, the blast pressure generated tends to be much higher and result in more damage.

Ventilation and/or dust collection systems are required in enclosed storage buildings as well to assist with removal of mobile equipment exhaust and any off-gassing from the product, and minimize dust.

All occupied buildings need to be located away from process areas, upwind of flare, vent and fired equipment, and outside of blast overpressure contours to protect personnel in the event of vapor release, fire or explosion.

Building design and orientation should also address environmental considerations such as prevailing weather direction (wind, dust, rain, snow) and provide adequate shelter for entrances. Car parks shall cater for all site personnel required during normal operation, taking into account shift working and visitors. Shelters may be required in severe climates.


Related Discussions:- Design control room for plant

Som, a steel bar is

a steel bar is

Cycle of operation of four-stroke spark ignition engine, With neat diagram ...

With neat diagram illustrate the cycle of operation of four-stroke spark ignition engine. In what respects four-stroke cycle CI engine differ from that of SI engine ?

Illustrate with required expression for hammer blow, Illustrate with requir...

Illustrate with required expression for Hammer Blow, Variation of tractive force, and Swaying Couple.

Seismic loads for structure-mounted equipment, Q. Seismic Loads For Structu...

Q. Seismic Loads For Structure-Mounted Equipment? For equipment mounted in a structure above grade, the governing equation for seismic force is: F p = A v C c Pa c W c , wh

Chemistry, Ask question #Minimum 100 whow to detect the presence of 2nd gro...

Ask question #Minimum 100 whow to detect the presence of 2nd group basic radicals ?ords accepted#

Bund and dike capacity, Bund / dike capacity is typically covered by local ...

Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are: • The net capacity of a bunded / dik

Illustrate the various functions of clutch, Illustrate the various Function...

Illustrate the various Functions of clutch and also explain the Principle of frictions Clutch ? What is the requirement of Transmission System & Explain the Arrangemnet for P

Determine the deflection under the loads, Determine the deflection under th...

Determine the deflection under the loads: Determine the deflection under the loads as shown in Figure Solution ∑ F y   = 0, so that R A + R B  = 80 + 20 = 100 k

Find the maximum shear stress - stepped circular bar, Find the maximum shea...

Find the maximum shear stress - stepped circular bar: A stepped circular bar ABC 4 m long fixed at one of the end 'A' is subjected to a torque of 10 kN-m. If the portion AB is

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd