Shop assembled, steam drum, risers, downcomers, and all other related equipment on the steam side shall be designed, fabricated and hydrostatically tested to all requirements of ASME Section I, Power boilers, henceforth will be known as the Code.

The seller shall also submit for the purchaser's acceptance, mechanical calculations of the WHB system, including exchanger and steam drum support calculations, platform structural calculations, wind and seismic loading to NBC of Canada and finite element analysis.

Corrosion allowances for tubes shall be 1.0 mm (1/32"). Channels and tubesheet corrosion allowances shall be 3.2 mm (1/8") for the process side and 1.6 mm (1/16") for the water side of shell.

External insulation shall not be applied on inlet channel. Unless otherwise stated in the data sheet, insulation on intermediate and outlet channels, on the shell portion of the exchanger, the steam drum, the risers and downcomers shall be provided by others.

The design metal temperature of channels, shell, tubes and tubesheet shall be restricted to 343oC (650oF). However, if tube metal temperature exceeds 343oC (650oF) it shall not be greater than 399oC (750oF). All connections shall be flanged, except risers, downcomers and the combustion chamber connections, which shall be beveled for full penetration welds.

Minimum nozzle size shall be 2" NPS with RFWN rated flanges. Nozzles shall not be located 50 mm (2") of any weld seams. Internal connections when flanged, shall be bolted with non-asbestos type gaskets; i.e., clinger C4400 and using bolting materials - SA 193 B8/304 CL1, 1A and SA 194-8.

The fabricator shall provide operating manuals, which shall be divided into at least four sections:

i. start-up

ii. operation

iii. shutdown and

iv. maintenance and spare parts

Before start-up, the manual shall provide instruction for acid cleaning of inside walls of drum and tubes from dirt and scales by using inhibited acid, passivation by alkaline wash and subsequently clean water flushing. Instruction shall be clear as to the strength of acid and alkaline solutions and quality of flushing water to be used. Furthermore, the manual shall advise whether removal of drum internals during acid cleaning operation is necessary.


Related Discussions:- Design and construction of waste heat boilers

Vibration, A bump/impact test is a simple technique used to determine a str...

A bump/impact test is a simple technique used to determine a structure’s natural frequency. Sketch a typical time wave response curve of such a test, then label the impact point an

Determine the critical load, Determine the critical load (W crit ) to ...

Determine the critical load (W crit ) to cause elastic instability of the rigidly jointed frame shown in Figure Q2. The frame members have constant bending stif

Determine the tension and reaction in cable - mechanics, Q:  The12m boom A...

Q:  The12m boom AB weight 1 KN, the distance of center of gravity G is 6 m from point A.  For the position given, determine the tension T in cable and reaction at B.

Induction heating, Induction Heating: Alternating current throughout i...

Induction Heating: Alternating current throughout induction coil adjacent the part to be treated induces eddy current via the part that is so heated. The benefit of such heati

Continuum, what is continuum in simple words

what is continuum in simple words

Specifications - boilers, SPECIFIC A TION S:    The boilers are s...

SPECIFIC A TION S:    The boilers are specified as per following parameters : -     Steam Generation Rate : for instance 50 000 kg /hr. -     Maximum Pressure: for

Design gas compressors, Q. Design Gas Compressors? As gas compressors a...

Q. Design Gas Compressors? As gas compressors are often high investment equipment, it makes sense to locate these well away from other equipment to minimize potential fire dama

Machien element, assumptions made in deriving a bending formula

assumptions made in deriving a bending formula

Sand blasting handling method, Sand blasting handling method:        ...

Sand blasting handling method:             On last experiment we had decided to use 3.0 bars as it shown better result. Now we had to investigate the sand blasting handling

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd