Design and construction of waste heat boilers, Mechanical Engineering

Assignment Help:

Shop assembled, steam drum, risers, downcomers, and all other related equipment on the steam side shall be designed, fabricated and hydrostatically tested to all requirements of ASME Section I, Power boilers, henceforth will be known as the Code.

The seller shall also submit for the purchaser's acceptance, mechanical calculations of the WHB system, including exchanger and steam drum support calculations, platform structural calculations, wind and seismic loading to NBC of Canada and finite element analysis.

Corrosion allowances for tubes shall be 1.0 mm (1/32"). Channels and tubesheet corrosion allowances shall be 3.2 mm (1/8") for the process side and 1.6 mm (1/16") for the water side of shell.

External insulation shall not be applied on inlet channel. Unless otherwise stated in the data sheet, insulation on intermediate and outlet channels, on the shell portion of the exchanger, the steam drum, the risers and downcomers shall be provided by others.

The design metal temperature of channels, shell, tubes and tubesheet shall be restricted to 343oC (650oF). However, if tube metal temperature exceeds 343oC (650oF) it shall not be greater than 399oC (750oF). All connections shall be flanged, except risers, downcomers and the combustion chamber connections, which shall be beveled for full penetration welds.

Minimum nozzle size shall be 2" NPS with RFWN rated flanges. Nozzles shall not be located 50 mm (2") of any weld seams. Internal connections when flanged, shall be bolted with non-asbestos type gaskets; i.e., clinger C4400 and using bolting materials - SA 193 B8/304 CL1, 1A and SA 194-8.

The fabricator shall provide operating manuals, which shall be divided into at least four sections:

i. start-up

ii. operation

iii. shutdown and

iv. maintenance and spare parts

Before start-up, the manual shall provide instruction for acid cleaning of inside walls of drum and tubes from dirt and scales by using inhibited acid, passivation by alkaline wash and subsequently clean water flushing. Instruction shall be clear as to the strength of acid and alkaline solutions and quality of flushing water to be used. Furthermore, the manual shall advise whether removal of drum internals during acid cleaning operation is necessary.


Related Discussions:- Design and construction of waste heat boilers

Powder metallurgy, why pre sintering needed in powder metallurgy

why pre sintering needed in powder metallurgy

Converying system, impact force equation of ship to jetty?

impact force equation of ship to jetty?

Determine the forces in strings, Determine the forces in strings: The...

Determine the forces in strings: The Electric light fixture weighing 15N hangs from point C , by two strings AC and BC . AC is inclined at 60° to the horizontal and BC

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

Impact testing, Charpy impact tests, when required shall comply. Impact ...

Charpy impact tests, when required shall comply. Impact tests shall be conducted at the minimum design metal temperature or at a lower temperature and shall meet or exceed energ

Define cutting parameters - depth of cut, Define Cutting Parameters - Depth...

Define Cutting Parameters - Depth of Cut It is the thickness of metal removed by grinding wheel in one traverse stroke (lengthwise) t=depth of cut  =D 1 -D 2 / 2

Calculate the amount sand-aggregate, Calculate the amount of cement, sand,...

Calculate the amount of cement, sand, aggregate, and water needed to create a concrete mix with a 28-day compressive strength of 34 MPa for a 10 m x 10 m x 0.25 m structure given t

Calculate the magnitude and position of the balance mass, The four masses m...

The four masses m1, m2, m3 and m4 having their radii of rotation as 200mm, 250mm, 150mm, 250mm and 300mm are 200kg, 300kg,240kg and 260kg in magnitude respectively. The angles betw

Spindle complaint gear shift, Spindle complaint Gear shift : Check spindle...

Spindle complaint Gear shift : Check spindle comp. Gear shift for bend, rust, arms for bend and arm spring condition and availability.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd