Design and construction of waste heat boilers, Mechanical Engineering

Assignment Help:

Shop assembled, steam drum, risers, downcomers, and all other related equipment on the steam side shall be designed, fabricated and hydrostatically tested to all requirements of ASME Section I, Power boilers, henceforth will be known as the Code.

The seller shall also submit for the purchaser's acceptance, mechanical calculations of the WHB system, including exchanger and steam drum support calculations, platform structural calculations, wind and seismic loading to NBC of Canada and finite element analysis.

Corrosion allowances for tubes shall be 1.0 mm (1/32"). Channels and tubesheet corrosion allowances shall be 3.2 mm (1/8") for the process side and 1.6 mm (1/16") for the water side of shell.

External insulation shall not be applied on inlet channel. Unless otherwise stated in the data sheet, insulation on intermediate and outlet channels, on the shell portion of the exchanger, the steam drum, the risers and downcomers shall be provided by others.

The design metal temperature of channels, shell, tubes and tubesheet shall be restricted to 343oC (650oF). However, if tube metal temperature exceeds 343oC (650oF) it shall not be greater than 399oC (750oF). All connections shall be flanged, except risers, downcomers and the combustion chamber connections, which shall be beveled for full penetration welds.

Minimum nozzle size shall be 2" NPS with RFWN rated flanges. Nozzles shall not be located 50 mm (2") of any weld seams. Internal connections when flanged, shall be bolted with non-asbestos type gaskets; i.e., clinger C4400 and using bolting materials - SA 193 B8/304 CL1, 1A and SA 194-8.

The fabricator shall provide operating manuals, which shall be divided into at least four sections:

i. start-up

ii. operation

iii. shutdown and

iv. maintenance and spare parts

Before start-up, the manual shall provide instruction for acid cleaning of inside walls of drum and tubes from dirt and scales by using inhibited acid, passivation by alkaline wash and subsequently clean water flushing. Instruction shall be clear as to the strength of acid and alkaline solutions and quality of flushing water to be used. Furthermore, the manual shall advise whether removal of drum internals during acid cleaning operation is necessary.


Related Discussions:- Design and construction of waste heat boilers

Thermodynemics, explain the following terms in brief:- point function and p...

explain the following terms in brief:- point function and path funtion

Engfine, how we made parts of engine

how we made parts of engine

Group technology, what are the limitations of group technology and life cyl...

what are the limitations of group technology and life cyle issues in group technology

Calculate for spring amount of load carried, Calculate for spring amount of...

Calculate for spring amount of load carried: The table below gives specific of a compound spring consisting of two co-axial close-coiled springs. If the spring is subjected to

Dual cycle of heat engine.., how to calculate the mean effective pressure o...

how to calculate the mean effective pressure of a dual cycle

Requirements for design structural steel, This section shall apply to the g...

This section shall apply to the general requirements for design, fabrication, erection, and testing of structural steels for supports, stairways, ladders and platforms. All stru

Determine the production rate, a) You were assigned to determine the produc...

a) You were assigned to determine the production rate for a polymer extrusion process. The extruder is found to have a barrel diameter = 4.5 in and length = 11 ft. The extruder scr

The motorcycle , Motorcycle, we have learnt about the various parts of a mo...

Motorcycle, we have learnt about the various parts of a motorcycle and their functions. Technical specifications of various models of motorcycles launched by the HHML were also not

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd