Design and construction of waste heat boilers, Mechanical Engineering

Assignment Help:

Shop assembled, steam drum, risers, downcomers, and all other related equipment on the steam side shall be designed, fabricated and hydrostatically tested to all requirements of ASME Section I, Power boilers, henceforth will be known as the Code.

The seller shall also submit for the purchaser's acceptance, mechanical calculations of the WHB system, including exchanger and steam drum support calculations, platform structural calculations, wind and seismic loading to NBC of Canada and finite element analysis.

Corrosion allowances for tubes shall be 1.0 mm (1/32"). Channels and tubesheet corrosion allowances shall be 3.2 mm (1/8") for the process side and 1.6 mm (1/16") for the water side of shell.

External insulation shall not be applied on inlet channel. Unless otherwise stated in the data sheet, insulation on intermediate and outlet channels, on the shell portion of the exchanger, the steam drum, the risers and downcomers shall be provided by others.

The design metal temperature of channels, shell, tubes and tubesheet shall be restricted to 343oC (650oF). However, if tube metal temperature exceeds 343oC (650oF) it shall not be greater than 399oC (750oF). All connections shall be flanged, except risers, downcomers and the combustion chamber connections, which shall be beveled for full penetration welds.

Minimum nozzle size shall be 2" NPS with RFWN rated flanges. Nozzles shall not be located 50 mm (2") of any weld seams. Internal connections when flanged, shall be bolted with non-asbestos type gaskets; i.e., clinger C4400 and using bolting materials - SA 193 B8/304 CL1, 1A and SA 194-8.

The fabricator shall provide operating manuals, which shall be divided into at least four sections:

i. start-up

ii. operation

iii. shutdown and

iv. maintenance and spare parts

Before start-up, the manual shall provide instruction for acid cleaning of inside walls of drum and tubes from dirt and scales by using inhibited acid, passivation by alkaline wash and subsequently clean water flushing. Instruction shall be clear as to the strength of acid and alkaline solutions and quality of flushing water to be used. Furthermore, the manual shall advise whether removal of drum internals during acid cleaning operation is necessary.


Related Discussions:- Design and construction of waste heat boilers

Confined space standard, Confined Space Standard Various examples of ...

Confined Space Standard Various examples of workplace exist in industrial practice where spaces are characterized by several restrictions. Such spaces are identified as: manh

Evaluate the stress in the bolt, (a) A steel bolt 650 mm 2 cross-sectional...

(a) A steel bolt 650 mm 2 cross-sectional area passes centrally through a copper tube to 1200mm 2 cross-sectional area. The tube is 500mm long and closed by rigid washers, which

Explain in detail about the large excavations, Explain in detail about the ...

Explain in detail about the Large excavations Large excavations required for construction of rafts may need dewatering, depending on the ground water flow and the choice of  a

Function of heat pump, Function of heat pump: Refrigerator The pr...

Function of heat pump: Refrigerator The primary function of heat pump is to transfer heat from the low temperature system to the high temperature system, this transfer of

Reassembly position of critical parts services tips, Reassembly Position of...

Reassembly Position of Critical Parts:  Care should be taken to note the position of the unidirectional parts while dismantling the engine. This will ensure dimensions (depth, dis

The parts and design of the pocket amp, The problem: - Deaf blind peop...

The problem: - Deaf blind people have a huge problem when crossing the streets. They always need assistance from a sighted person or a trained dog to cross the street. There i

Thermal engineering, Air enters the compressor of an ideal air standard Bra...

Air enters the compressor of an ideal air standard Brayton cycle at 100kPa, 250C with a volumetric flow rate of 8m3/s and is compressed to 1000kPa. The temperature at the inlet to

Registering small scale unit of entrepreneurship development, Registering a...

Registering a Small Scale Unit: Small Scale and ancillary units (i.e. undertaking with investment in plant and machinery of less than Rs. 6.0 million and Rs. 7.5 million respectiv

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd