Describe the slope - area method, Mechanical Engineering

Assignment Help:

Q. Describe the Slope - Area Method?

In the event of infeasibility of Velocity Area method on account of either rapid rise or fall of floods or lack of equipment or any other reason, the Slope-Area method is adopted for rough estimation of discharge.

The requirements of site are mostly similar to those in case of Velocity-Area method. In addition, the length of the reach in Slope-Area method is required to be reasonably stable, free from obstruction, straight and of uniform section for a length not less than 5 times the width of the channel and in any case not less than 300 m. The surface drop in this reach is also required to be not less than 150 mm. The gauges are read to 2 mm and the slope is worked out from the average of gauge observations at either end of the reach.


Related Discussions:- Describe the slope - area method

Kinematic and dynamics, In Figure P4.2 , ?1 = 200 rad/s cw and a1 = 4000 ra...

In Figure P4.2 , ?1 = 200 rad/s cw and a1 = 4000 rad/s2 cw, Find the acceleration of points B, C, and D and the angular acceleration of link 2?

Describe and derive an expression for energy method, Split the harmonic mot...

Split the harmonic motion x=10 sin (wt + 30 0 ) into two harmonic motions one having a phase angle of zero and the other of 45 0 . Describe and derive an expression for energy m

Categorization of geometric models, Q. Categorization of Geometric models? ...

Q. Categorization of Geometric models? Modern CAD systems define objects in 3-D. Thus, the designer can construct 3-D model of objects conveniently and store the database of th

Crystal structure , Explain with neat sketches the various types of crystal...

Explain with neat sketches the various types of crystal imperfections

Kkleins constraction, What is the limition of kkleins constraction?

What is the limition of kkleins constraction?

What is erosion loss, Q. What is Erosion Loss? Additional metal thickne...

Q. What is Erosion Loss? Additional metal thickness must be added in specific locations where metal loss is expected, due to stream flow that is of high velocity, or is abrasiv

Hydropower scheme, 4. Design a run-of-the river hydropower scheme for a riv...

4. Design a run-of-the river hydropower scheme for a river in the Scottish Borders with potential level different of 15 m carrying water from a catchment area of 14 km by 25 km. I

Piston and piston rings - part of combustion engine, Piston and Piston Ring...

Piston and Piston Rings - Part of combustion engine: Piston: The piston reciprocates within cylinder and transmits force exerted by expanding gases to crank by means of conn

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd