Q. Describe the Slope - Area Method?
In the event of infeasibility of Velocity Area method on account of either rapid rise or fall of floods or lack of equipment or any other reason, the Slope-Area method is adopted for rough estimation of discharge.
The requirements of site are mostly similar to those in case of Velocity-Area method. In addition, the length of the reach in Slope-Area method is required to be reasonably stable, free from obstruction, straight and of uniform section for a length not less than 5 times the width of the channel and in any case not less than 300 m. The surface drop in this reach is also required to be not less than 150 mm. The gauges are read to 2 mm and the slope is worked out from the average of gauge observations at either end of the reach.
Q. Design Bulk Materials Storage? Consideration shall be given to providing access to safety showers in areas of hazardous bulk material handling and storage. Where bulk handli
(a) Describe clearly the constructional details and operation of various rear axle drives with the engine placed at the front. Illustrate your answer with simple and neat sketch.
Illustrate how the efficiency of Rankine Cycle can be improved by the use of Regenerative and Reheat heating. (b) During a test on boiler trial the following data were obtained
An air refrigerator operates between the pressure limits of 1 bar and 5 bar. The temperature of the air entering the compressor and expansion cylinder are 15 o C and 25 o C respect
all information about lifting machine
(i) Hydraulic press: This can be used to lift a heavy load placed on the platform of larger piston or to press the things placed among the piston and the heavy platfor
Conventional Priority Rules The standard solution for production scheduling (routing and sequencing) difficulties is the utilization of priority rules. A priority rule is an o
a) Describe productivity. Give comparison of production and productivity. b) Write down characteristics of batch production. c) What are advantages and limitations of job eva
step to draw velocity and accelartion diagram
WELDING PROCEDURE AND PERFORMANCE QUALIFICATION A total quality assurance scheme, embracing all aspects of manufacture would have necessarily made all attempts to ensure
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd