Describe the behaviour of pre and post-tensioned members, Civil Engineering

Assignment Help:

Describe the behaviour of pre and post-tensioned members

The behaviour of pre and post-tensioned members under imposed loads may be different, especially when the cracking patterns of these members are analysed. Cracks are few and far in-between but of a larger length and width in the case of unbonded post-tensioned concrete members. 


Related Discussions:- Describe the behaviour of pre and post-tensioned members

Lines, find the equation of the line with slope 4 and passing through the p...

find the equation of the line with slope 4 and passing through the point of intersection of the line x+6y-4=0 ad 3x-4y+2=10

Diffrence between rowe cell and oedometer apparatus, Q. Diffrence between R...

Q. Diffrence between Rowe cell and Oedometer apparatus? The benefits of using Rowe cell over oedometer apparatus are:  (i)  It possesses control facilities for drainage and

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

Major dissimilarity between standpipe, Question What is major dissimila...

Question What is major dissimilarity between standpipe, standpipe piezometer and piezometer ? Answer Standpipe usually contains plastic pipes with punctured holes at

Explain coagulation - Surface Water, Explain Coagulation Surface wa...

Explain Coagulation Surface waters must be treated to remove turbidity, color and bacteria The traditional sand filtration is not sufficient in removing bacteria, viru

Illustrate bituminous surfacing over concrete structures, Q. Illustrate Bit...

Q. Illustrate Bituminous surfacing over concrete structures? Usage of bituminous surfacing over concrete structures (for instance existing concrete roads) is widespread to impr

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

Choosing between trailer suction hopper and grab dredgers, Question In ...

Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

Bitumen, unit of kinematic viscosity

unit of kinematic viscosity

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd