Describe about the prestressed concrete, Civil Engineering

Assignment Help:

Describe about the Prestressed concrete

Civil engineering structures, such as buildings, bridges, dams, towers etc. and their structural components such as beams, columns, slabs and foundations are generally subjected to various types of loads. These loads produce strains and consequently stresses develop in them. We know that if stresses exceed the material strength, the material of the structural component may crack. Cracking of a structural component may lead to a deterioration of its load bearing capacity and it may be responsible for its failure sometime. 


Related Discussions:- Describe about the prestressed concrete

Support reaction, different types of support force & effect of hinge suppor...

different types of support force & effect of hinge support

Traditional granular sub-base, Question For rigid pavement, what is rec...

Question For rigid pavement, what is recompense of using lean concrete sub-base instead of traditional granular sub-base? Answer There are some shortcomings of using

Preparation for underwater inspection - tool and equipment, Preparation for...

Preparation for Underwater Inspection - Availability of Tools and Equipment The engineer-in-charge, before taking up the inspection, should list out the complete equipment req

Determine the bar sizes and spacing, Referring to problem 1, in order to me...

Referring to problem 1, in order to meet a 1-hour fire code rating the slab thickness must be at least 4.00. Based on the information given in problem 1 and with a slab thickness o

Explain the shrink factor of soil, Explain the Shrink Factor of Soil In...

Explain the Shrink Factor of Soil In addition to the swell factor and its associated load factor, soil also has a shrink factor. While the first two relate the volume of an equ

Calculate the degree of saturation of the soil, A clay sample, having its n...

A clay sample, having its natural moisture content, weighs 0.333 N. The specific gravity of solids of this soil is 2.70. After oven-drying, the soil sample weighs 0.2025 N. The vol

Proctor test for GSB material, what is the procedure for gsb proctor test f...

what is the procedure for gsb proctor test for matrial sampling for lab density

Define project schedule financial analysis, The 6 monthly payment applicati...

The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd