deflection of beams, Civil Engineering

Assignment Help:
1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KNm at A.Determine:
a. The reaction at A and C
b. Draw shear force and BM diagrams
c. Slope at A
d. Slope and deflection at B

Take E=200kn/mm square
I = 270x10 to the power 6

Related Discussions:- deflection of beams

What is rail lubricators, Q. What is Rail Lubricators? 1. P & M type of...

Q. What is Rail Lubricators? 1. P & M type of lubricators - These lubricators can be used for lubrication of FF rails as well as BH rails. 2. Elgi grease pump - Elgi Bucket

Formation of holes in pipelines, Question While branch pipelines are co...

Question While branch pipelines are connected to pipelines, now and then Y-junctions or fitting branched pipelines to key pipelines by formation of holes in pipelines are u

ENGlLISH, Ask question #WHAT is presentation skill #

Ask question #WHAT is presentation skill #

Flash point test, Flash Point Test: The flash point is the temperatur...

Flash Point Test: The flash point is the temperature at which the bitumen gives off vapours which ignite in the presence of a flame. The flash point temperature gives the cri

Define the transmissivity and reynold number, Define the Transmissivity and...

Define the Transmissivity and Reynold Number TRANSMISSIVITY: (T) A measurement of the rate of groundwater movement through different soil and rock materials. For both confined

Explain the term - non-bonded prestressed concrete, Explain the term - Non-...

Explain the term - Non-bonded Prestressed Concrete It is a method of construction in which the tendons are not bonded to the concrete. Ducts, housing the tendons, are not grout

Retaining walls, Retaining Walls: A wall used to retain some material ...

Retaining Walls: A wall used to retain some material on one or both sides of it can be termed as retaining wall. Commonly, it is used to retain soil at two different levels on

Explain standard penetration test used in soil exploration, Explain the "St...

Explain the "Standard Penetration Test" used in soil exploration. List the information that can be obtained by the test when made in (a) clay, (b) sand. Comment on the correctio

Wbm work, ratio of moorum and aggregate

ratio of moorum and aggregate

Concrete pavement, Question In case of concrete pavement, why is requir...

Question In case of concrete pavement, why is requirement of 95% by mass of quartz grains are specified in contract? Answer In universal Specification of Civil Enginee

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd