Define Underwater Magnetic Particle Testing?

Underwater magnetic particle testing (UWMT) is a non-destructive testing suited for detection of surface cracks or discontinuities in magnetic materials underwater. Magnetic particles are attracted to flux leak- ages at the surface of magnetised materials forming a ridge of magnetic particles around the surface cracks. In operation, magnetic element is magnetised using an electro- magnetic yoke specially designed for underwater use.

Where surface discontinuities exist, with the yoke's field of influence, magnetic flux will escape from the surface of the part. Slurry of magnetic particles are attracted to, and aligned along with the leaking magnetic flux. The particles are brightly coloured and form a visible indication corresponding to the location of discontinuities at or very near the part surface.


Related Discussions:- Define underwater magnetic particle testing

Compute the stresses at top and bottom fibres, Compute the stresses at top ...

Compute the stresses at top and bottom fibres in a simply supported pre-stressed concrete beam with a rectangular cross section, 200 mm wide and 400 mm deep at sections A-A, B-B an

Define hammer efficiency and coefficient of restitution, Q. Define Hammer e...

Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i

Diffrence between rowe cell and oedometer apparatus, Q. Diffrence between R...

Q. Diffrence between Rowe cell and Oedometer apparatus? The benefits of using Rowe cell over oedometer apparatus are:  (i)  It possesses control facilities for drainage and

Determine the total head and total pressure of water, Determine the total h...

Determine the total head and total pressure of water flowing at  in a pipe which has the following data: Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter =

Construct the shear force and bending moment diagrams, A Beam A B 12 meter ...

A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute

Illustrate the term - failure due to rupture of steel, Failure Due to Ruptu...

Failure Due to Rupture of Steel This mode of  failure is likely in lightly reinforced concrete members in which the ultimate strength of  steel is attained before the concrete

Compute the included angles, Example. With a surveyor compass the ang...

Example. With a surveyor compass the angles observed in traversing the lines AB, BC, CD, DE and EF are  as. Compute the included angles and indicate them in a neat sketch.

Important parts of road pavements, Important parts of road pavements: ...

Important parts of road pavements: Prime Coat : Application of a low viscosity bituminous binder over a granular base to fill up the voids. Tack Coat : Application of b

Explain civil fe hydraulics and hydrologic systems, Explain Civil Fe Hydrau...

Explain Civil Fe Hydraulics and Hydrologic Systems When spills occur at grade on soils in areas where unconfined aquifers are present, remediation procedures to remove the poll

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd