Define the Planning an Underwater Inspection?

Planning for underwater inspection is important because of

- Unknown factors which may be discovered during the diving

- The difficulty in verifying the thoroughness of the inspection

- The cost of conducting underwater inspection.

The above factors are most influential for first time underwater inspection, which set a benchmark for further inspections. The effectiveness of an underwater inspection depends on the agency’s ability to properly consider all factors:

- Method of underwater inspection

- Diving inspection intensity level

- Type of inspection

- Qualification of diver/inspecting team With these factors considered, one may opt for a lower level of inspection.

Depending on the conditions and type of damage found, a higher level of inspection may then be necessary to determine the actual bridge condition. It may also be possible that different levels may be required at various locations on the same bridge.


Related Discussions:- Define the planning an underwater inspection

Strength of Materials , Need to know about compressive strength test and te...

Need to know about compressive strength test and tensile strength test of cement

Survying, what aare the parts and function of steel tape ?

what aare the parts and function of steel tape ?

Example for productivity analysis and improvement, Example for Productivity...

Example for Productivity Analysis and Improvement An excavator with a bucket capacity of 3-yd 3 has a standard production rate of 2,160-yd 3 for an 8-hour day.  The job site

Constructed wetland design guidelines, Develop a simple urban constructed w...

Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following: I. Data required for the design II. Types of constructed

Shape factor, For a solid circular shaft transmitting torque, the shape fac...

For a solid circular shaft transmitting torque, the shape factor is

Classification of timber based on availability:, Classification Based on Av...

Classification Based on Availability: Forest departments categorized timbers based on the availability as X=Most common. 1415 m 3 or more per year Y=Common. 355 m 3 to 1415

Concrete, What is compacting factor

What is compacting factor

Determine the preliminary settlement analysis, Preliminary settlement analy...

Preliminary settlement analysis for a building indicated a settlement of 50 mm in 4 years and an  ultimate  settlement  of  250 mm.  The average pressure increment in the clay stra

Calculate the total area (acre) for lot, Calculate the Total Area (acre) fo...

Calculate the Total Area (acre) for Lot A 30-ft wide parabolic shaped stream divides the property as shown.  The total area (acre) for Lot 6 is most nearly: Solution:

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd