Define the Planning an Underwater Inspection?
Planning for underwater inspection is important because of
- Unknown factors which may be discovered during the diving
- The difficulty in verifying the thoroughness of the inspection
- The cost of conducting underwater inspection.
The above factors are most influential for first time underwater inspection, which set a benchmark for further inspections. The effectiveness of an underwater inspection depends on the agency’s ability to properly consider all factors:
- Method of underwater inspection
- Diving inspection intensity level
- Type of inspection
- Qualification of diver/inspecting team With these factors considered, one may opt for a lower level of inspection.
Depending on the conditions and type of damage found, a higher level of inspection may then be necessary to determine the actual bridge condition. It may also be possible that different levels may be required at various locations on the same bridge.
maintenance of wbm roadstion
Disadvantages of cement sand mortor
Estimate the single room of size 3m x 4m x height 3m using individual wall method?
Explain the Interim inspection - underwater inspection of bridge An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is us
Question General requirement for Civil Engineering Works in 1992 Edition, Clause 15.09 details that tying wires for strengthening adjacent to and above Class F4 and F5 closes must
The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o
What is the rate of application of Prime coat over WBM
State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces
distomat
parabola by offset method
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd