Define the Planning an Underwater Inspection?
Planning for underwater inspection is important because of
- Unknown factors which may be discovered during the diving
- The difficulty in verifying the thoroughness of the inspection
- The cost of conducting underwater inspection.
The above factors are most influential for first time underwater inspection, which set a benchmark for further inspections. The effectiveness of an underwater inspection depends on the agency’s ability to properly consider all factors:
- Method of underwater inspection
- Diving inspection intensity level
- Type of inspection
- Qualification of diver/inspecting team With these factors considered, one may opt for a lower level of inspection.
Depending on the conditions and type of damage found, a higher level of inspection may then be necessary to determine the actual bridge condition. It may also be possible that different levels may be required at various locations on the same bridge.
Calculate the Benefit-Cost Analysis Ratio A city engineer is deciding which of two alternatives to select. If the interest rate is 10% per year, the Benefit-Cost analysis rat
what is stepped aeration
What are the conditions essential for Darcy's law to be applicable for flow of water by soil ? Why is the permeability of a clay soil with flocculated structure greater than tha
Using Matlab/ Simulink software, verify the heating requirement (kW) for the building because of air infiltration and natural ventilation. Note that this needs you to estimate air
write a short note on angular messurement using stations?
how we calculate barometric leveleing
Question In a concrete compression test , usually 150mmx150mmx150mm concrete cube examples are used for testing. Why isn't 100mmx100mmx100mm concrete cube samples used in test in
What are the principles of working from whole to part in surveying?
Test required before laying or after laying.
Do we take the whole length (including the over hanging portion when we say the "whole span" of th beam ?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd