Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Define the Planning an Underwater Inspection?
Planning for underwater inspection is important because of
- Unknown factors which may be discovered during the diving
- The difficulty in verifying the thoroughness of the inspection
- The cost of conducting underwater inspection.
The above factors are most influential for first time underwater inspection, which set a benchmark for further inspections. The effectiveness of an underwater inspection depends on the agency’s ability to properly consider all factors:
- Method of underwater inspection
- Diving inspection intensity level
- Type of inspection
- Qualification of diver/inspecting team With these factors considered, one may opt for a lower level of inspection.
Depending on the conditions and type of damage found, a higher level of inspection may then be necessary to determine the actual bridge condition. It may also be possible that different levels may be required at various locations on the same bridge.
Need to know about compressive strength test and tensile strength test of cement
what aare the parts and function of steel tape ?
how to design asewa system ??
Example for Productivity Analysis and Improvement An excavator with a bucket capacity of 3-yd 3 has a standard production rate of 2,160-yd 3 for an 8-hour day. The job site
Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following: I. Data required for the design II. Types of constructed
For a solid circular shaft transmitting torque, the shape factor is
Classification Based on Availability: Forest departments categorized timbers based on the availability as X=Most common. 1415 m 3 or more per year Y=Common. 355 m 3 to 1415
What is compacting factor
Preliminary settlement analysis for a building indicated a settlement of 50 mm in 4 years and an ultimate settlement of 250 mm. The average pressure increment in the clay stra
Calculate the Total Area (acre) for Lot A 30-ft wide parabolic shaped stream divides the property as shown. The total area (acre) for Lot 6 is most nearly: Solution:
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd