Define the meaning of circular prestressing, Civil Engineering

Assignment Help:

Define the meaning of circular prestressing

In circular prestressing, tendon wires are wrapped under tension over the concrete pipes which are pre-cast. The tension in the tendon wires is produced by pulling it through a die. Prestressed concrete pipes are ideally suited for a pressure range of 0.5 to 2 N/mm2.  For this pressure range, cast iron pipes and steel pipes are not economical. Reinforced concrete pipes also are not practicable for use as these have limited tensile strength.

 


Related Discussions:- Define the meaning of circular prestressing

Explain the clearance interval - signalized intersections, Explain the Clea...

Explain the Clearance Interval - Signalized Intersections  Also known as "Red Clearance Interval" and "All Red"        r = (w+L) / V - If there is no pedestrian traffic r

Explain fluid mechanics or properties – viscosity, Explain Fluid Mechanics ...

Explain Fluid Mechanics or Properties – Viscosity A measure of a fluid's resistance to flow when acted upon by an external force such as pressure or gravity. Also termed, "Abso

Significance of tailwater level in culverts, Significance of tailwater leve...

Significance of tailwater level in culverts Headwater level and tailwater level of culverts are significant parameters in hydraulic design. Headwater level can't be set too la

What is unimat machine, Q. What is Unimat Machine? The machine has got ...

Q. What is Unimat Machine? The machine has got 16 independently tiltable tamping tools which enable the machine to work on points and crossing as well as on plain track. The ma

Determine the total lateral pressure on the wall, A masonry retaining wall ...

A masonry retaining wall is 1.5 m wide at the top, 3.5 m wide at the base and 6 m high. It is trapezoidal in section and has a vertical face on the earth side. The backfill is leve

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Verify the optimum value of the spacing of the piles, A 16-pile group has t...

A 16-pile group has to be arranged in the form of a square in soft clay with uniform spacing. Neglecting end-bearing, verify the optimum value of the spacing of the piles in terms

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd