Define the meaning of circular prestressing, Civil Engineering

Assignment Help:

Define the meaning of circular prestressing

In circular prestressing, tendon wires are wrapped under tension over the concrete pipes which are pre-cast. The tension in the tendon wires is produced by pulling it through a die. Prestressed concrete pipes are ideally suited for a pressure range of 0.5 to 2 N/mm2.  For this pressure range, cast iron pipes and steel pipes are not economical. Reinforced concrete pipes also are not practicable for use as these have limited tensile strength.

 


Related Discussions:- Define the meaning of circular prestressing

Industrial steel floor fire proof, i want to know the construction details ...

i want to know the construction details of industrial steel floor?

Surveying, if bearing of AB is 190& that of CB is 260,the included angle AB...

if bearing of AB is 190& that of CB is 260,the included angle ABC is how?

Zero energy building , this is our final year project .please help me to gu...

this is our final year project .please help me to guide about it

State the short-term deflections, State the short-term deflections If  ...

State the short-term deflections If  short-term deflections are considered, the instantaneous deflection due to design loads may be calculated using elastic analysis based on t

Explain forty-five degree spread rule for driven piles, Q. Explain Forty-fi...

Q. Explain Forty-five degree spread rule for driven piles ? For driven piles the length of piles driven into the ground is generally based on dynamic driving formula such as Hi

W.M.M., What is W.M.M. roads? Where its used ?

What is W.M.M. roads? Where its used ?

What are the causes of settlement, Q. What are the causes of settlement? ...

Q. What are the causes of settlement? The various causes of settlement are: 1) increasing load on the surrounding soil deposit, 2) excavation, 3) lowering of water tab

Break even point, Break even point: EM Electricals, Inc., contains fix...

Break even point: EM Electricals, Inc., contains fixed costs of Rs. 600,000 this period. Variable costs involved labour charges of Rs.100 per unit and material cost of Rs. 200

Telecommunication, Blocked process list is not maintioned in priority order...

Blocked process list is not maintioned in priority order why

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd