Define the Hazard Ranking system (HRS)
- A procedure for ranking uncontrolled hazardous waste sites in terms of the potential threat based upon the containment of the route of release, hazardous substances, characteristics and amount of the substances, and similarly targets.
- Represents the relative hazards posed by a site and potential for human and environmental exposure.
- The Hazard Ranking system score is based on the probability of contamination from four pathways - groundwater, surface water, soil and air.
Q. Bitumen emulsions - difference between anionic emulsions and cationic emulsions? Bitumen emulsions comprises particles of bitumen dispersed in water by using emulsifying age
what is filtration membrane, is it''s type mechanism
A clay layer 5 m thick has double drainage. It was consolidated under a load of 127.5 kN/m2. The load is enhanced to 197.5 kN/m 2 . The coefficient of volume compressibility is 5.7
Explain the Watersheds - Hydrology The surface area on which runoff generated will flow to a common stream or body of water by gravity. Often separated by higher elevations/top
select three materials metal and non mealat at least one of the selected materials shold change its property
Q. A crossover is to be laid between two parallel B. G. tracks at 4.725 m centers by using 52 kg, 1 in 8½ and 1 in 12 turnouts. For this layout, i. Determine the main geometrica
Discuss about the fibre reinforced concrete Tensile strength of concrete may be improved by using a higher grade of concrete or by using special concretes such as fibre reinfor
some expansion joint(10 mm- 20 mm) on my basement roof.rain water leakage in basement i want the solution of expiation joint and water leakes.
maintenance of wbm roadstion
Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd