Define the cost per square foot of contact area, Civil Engineering

Assignment Help:

Define the Cost per Square Foot of Contact Area

The cost of concrete formwork is influenced by three factors:

1. Initial cost or fabrication cost that contains the cost of transportation, materials, assembly, and erection.

2. Potential reuse which decreases the final total cost per square foot of contact area. The data in Table indicates that the maximum economy can be achieved by maximizing the number of reuses.

588_Define the Cost per Square Foot of Contact Area.png

3. Stripping costs, this also includes the cost of cleaning and repair. This item tends to stay constant for each reuse up to a fixed point at which the total cost of repairing and cleaning start rising rapidly.

In deciding to use a specific formwork system, the initial cost should be evaluated versus the available budget for formwork cost. Some formwork systems tend to have a high initial cost, but through repetitive reuse, they become economical.

For example, slip forms have a high initial cost, but the average potential reuse (usually over 100 times) reduces the final cost per square foot of contact area for the type of formwork. In the case of rented formwork systems, the period of time the formwork is in use has a great effect on the cost of the formwork.


Related Discussions:- Define the cost per square foot of contact area

Job, How to get assignment submitting jobfor work from home

How to get assignment submitting jobfor work from home

Determine the interdependent phases of investigation, Determine the interde...

Determine the interdependent phases of investigation The following are the interdependent phases of investigation: i)  Stratigraphical survey, ii) Physical survey, and

Construction of embankment, Construction of Embankment: The following...

Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed

Stone, Explain briefly physical classifications of stone

Explain briefly physical classifications of stone

Calculate the poissons ratio, Calculate the Poissons Ratio: In separat...

Calculate the Poissons Ratio: In separate experiments, Young's Modulus and Rigidity Modulus of a material have been determined as 120 GPa and 50 GPa respectively. Calculate th

Assignment, on timber, varieties , preservation, and seasoning of timber

on timber, varieties , preservation, and seasoning of timber

Determine the common ways to present the project schedule, Common ways to p...

Common ways to present the project schedule include all except: a. Gantt charts b. Milestone charts c. PERT charts D. Project Network Diagrams with dates added   So

Why we use air valves, Q. Why we use Air Valves? Air Valves - Air valve...

Q. Why we use Air Valves? Air Valves - Air valves of proper size and pressure rating at summits. Air valves ensure the safety of the pipe line against collapse when at points o

Designing of corbel beams in a pump station, Question In designing of ...

Question In designing of corbel beams in a pump station , why are shear links designed in top 2/3 of section? What is general advice on designing? Answer Corbel

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd