Define the cost per square foot of contact area, Civil Engineering

Assignment Help:

Define the Cost per Square Foot of Contact Area

The cost of concrete formwork is influenced by three factors:

1. Initial cost or fabrication cost that contains the cost of transportation, materials, assembly, and erection.

2. Potential reuse which decreases the final total cost per square foot of contact area. The data in Table indicates that the maximum economy can be achieved by maximizing the number of reuses.

588_Define the Cost per Square Foot of Contact Area.png

3. Stripping costs, this also includes the cost of cleaning and repair. This item tends to stay constant for each reuse up to a fixed point at which the total cost of repairing and cleaning start rising rapidly.

In deciding to use a specific formwork system, the initial cost should be evaluated versus the available budget for formwork cost. Some formwork systems tend to have a high initial cost, but through repetitive reuse, they become economical.

For example, slip forms have a high initial cost, but the average potential reuse (usually over 100 times) reduces the final cost per square foot of contact area for the type of formwork. In the case of rented formwork systems, the period of time the formwork is in use has a great effect on the cost of the formwork.


Related Discussions:- Define the cost per square foot of contact area

Determine the dimension of the vertical side walls, Determine the dimension...

Determine the dimension of the vertical side walls for a rectangular open channel designed to convey 150 cfs of storm water runoff. The runoff is collected in the parking lots and

Explain the signalized intersections - transportation, Explain the Signaliz...

Explain the Signalized Intersections Cycle length - the time required for one complete sequence of all signal indications Phase - the right-of-way (green), change (yellow),

Tests on bitumen, Tests on Bitumen: The following tests are conducted...

Tests on Bitumen: The following tests are conducted on bitumen to find its suitability as a road binder : (a) Penetration test (b) Softening Point test (c) Flash Poi

Axial flow pumps for large flows and low heads, Q. Axial flow pumps for lar...

Q. Axial flow pumps for large flows and low heads? It is well known that axial flow pumps are the most suitable for providing large flows and low heads. Reason behind this is c

Design an equalization basin with a safety factor, A storm occurs with rain...

A storm occurs with rain of varying intensity falling over a commercial area. The area has a combined sewer system. Two interceptor sewers direct flow to the wastewater treatment p

Surface drainage, Surface Drainage: Surface drainage deals with arran...

Surface Drainage: Surface drainage deals with arrangement for quickly leading the water from rainfall away from the surface of pavements, shoulders, slopes of embankments and

Define recommendations for design of ptfe sliding bearing, Define Recommend...

Define Recommendations for Design of PTFE Sliding Bearing? Other Recommendations for Design of PTFE Sliding Bearing 1. Expansion bearings having sliding surfaces of PTFE sha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd