Define special considerations for underwater inspection, Civil Engineering

Assignment Help:

Define Special considerations for underwater inspection?

Once a diver enters the water, there environment changes completely. Visibility decreases and is often reduced to near zero due to muddy water and depth. The diver not just has decreased perceptual capabilities but is less mobile also. Manoeuvrability is necessary for underwater bridge inspections. In several cases, artificial lighting is needed. In addition to above, certain special situations are encountered, which require special consideration.


Related Discussions:- Define special considerations for underwater inspection

Complete embedment of pipelines into thrust blocks, Q. Complete embedment o...

Q. Complete embedment of pipelines into thrust blocks For unreinforced concrete thrust blocks in bends and tees for pressurized pipelines, it's recommended that contact surfac

Cross-section of exogenous tree, The cross-section of exogenous tree is as ...

The cross-section of exogenous tree is as shown in given figure.The following components are visible to the naked eye:           Cross-section of exogeneous tree 1. P

Designing of corbel beams in a pump station, Question In designing of ...

Question In designing of corbel beams in a pump station , why are shear links designed in top 2/3 of section? What is general advice on designing? Answer Corbel

Explain the term -tendon splices, Tendon splices Tendon splices are us...

Tendon splices Tendon splices are used to join tendons when continuous prestressed concrete , members require long tendons to achieve continuity. Several types of tendon splic

Foundation, what are factors that affect bearing capacity of a shallow foot...

what are factors that affect bearing capacity of a shallow footing

#title., desirable properties in green concrete

desirable properties in green concrete

Calculate the uniform pressure on the soil, The plan of a proposed spoil he...

The plan of a proposed spoil heap is shown in Fig. The heap will stand on a thick deposit of soft clay with E-value 15 MN/m 2 . The uniform pressure on the soil may be suppose as 1

Define the ignitability - hazardous waste, Define the Ignitability - Hazard...

Define the Ignitability - Hazardous Waste - is a liquid with flash point - Not a liquid and capable of spontaneous and sustained combustion under normal conditions - Ign

Finite Element Method formulation, 1. [6 marks] Treating the bar illustrate...

1. [6 marks] Treating the bar illustrated above as being a one dimensional axial bar where plane sections remain plane and parallel, analyse the bar using the Galerkin finite eleme

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd