Define non-destructive inspection of concrete substructures, Civil Engineering

Assignment Help:

Define Non-destructive inspection of Concrete Substructures?

If there is evidence of significant deterioration, then a Level III inspection, involving either non-destructive or destructive tests, may be required. Some of the NDT equipments that can be used for underwater examination of concrete are:

- Rebound Hammer

- Ultrasonic system

- Magnetic Rebar Locator

Each instrument consists of an underwater sensor connected to a topside deck unit through an umbilical cable. The deck unit contains the signal conditioning electronics and data acquisition system. To operate the instrument, the diver has to position the underwater sensor on a previously cleaned portion of the structure surface, and person topside operates the data acquisition system in order to collect and store the data.


Related Discussions:- Define non-destructive inspection of concrete substructures

Cleaning and greasing of rocker, Cleaning and greasing of Rocker & Roller b...

Cleaning and greasing of Rocker & Roller bearings of open web through girders : In case of standard open web through girders, no separate jacking arrangement is required as the en

Reverse and direct circulation drill drilling in piling, Q. Reverse and dir...

Q. Reverse and direct circulation drill drilling in piling? For reverse circulation drilling and direct circulation drilling, major difference in drilling method is connected t

Bending moments& shear force, calculate bending &shear force of 16kn/m and ...

calculate bending &shear force of 16kn/m and draw the shear force and bending moment diagrams

Quantity calculation for subgrade preparation, reparation of subgrade in sq...

reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing

Determine the factor of safety against overturning, A trapezoidal masonry r...

A trapezoidal masonry retaining wall 1 m wide at top and 3 m wide at its bottom is 4 m high. The vertical face is retaining soil (φ = 30°) at a surcharge angle of 20° with the hori

Water-bound macadam road construction for unpaved roads, how can I come up ...

how can I come up with the research on the water bound macadam road construction

Determine the meaning of prestressed concrete, Determine the meaning of Pre...

Determine the meaning of Prestressed Concrete It is a type of concrete in which permanent internal stresses of  a suitable nature, magnitude and distribution are intentionally

What is preset in bridge bearing, Q. What is Preset in bridge bearing? ...

Q. What is Preset in bridge bearing? 'Preset' is a method to decrease the size of upper plates of sliding bearings in order to save cost. Normal length of an upper bearing plat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd