Define flare and vru system, Mechanical Engineering

Assignment Help:

Q. Define FLARE AND VRU SYSTEM?

VRU, HP and LP Flare systems are used to collect normal and emergency releases from the process and recycle or dispose of them in a safe manner.

The HP Flare system is responsible for collecting and disposing of process streams resulting from manual vents, emergency reliefs or upset conditions from diverse equipment throughout the facility.

Fluid from the flare header enters into the HP Flare Knockout Drum, where liquid and vapour are separated. The vapour flows to the HP Flare Stack where the HC gas is combusted into CO2 and H2O. The liquid from HP Flare KO Drum is sent to the Slop Tanks. Both the HP flare header into the drum and the line from the drum to the stack are sloped downwards towards the drum to prevent condensed liquid from accumulating in the flare header or entering the flare stack.

The VRU system is provided for all recoverable tank vapours and low pressure process vapours. Usually this includes vapours from the closed HC Drain Vessels, Evaporator Package, Surge Tank, Skim Tank, De-Oiled Water Tank, IGF Package, Desand Tank, Slop Tank, Dilbit Tank, Off-Spec Tank, Diluent Tank and Slop Treater Package (if any). The VRU Package increases the pressure of recovered vapours in order to mix them with the other vapours feeding the Mixed Fuel Gas Separator. (The description may be different in various SAGD plants). The VRU package may contain a VRU Suction Cooler, Scrubber, Scrubber Pumps, VRU Compressors, Compressor Cooler and Discharge Separator.

The vapour from VRU header flows to the cooler to cool down the vapour and collecting condensed liquids prior to compression. The liquid is pumped out to Slop Tank and vapour is sent to the compressor. The discharge gas flows to the Discharge Cooler and Separator (three phase) and the overhead gas is routed to the FG system and HC liquids are sent to Slop Tank.

The LP Flare Header collects gas from process sources that cannot withstand backpressure in excess of 3.45 kPag. Normally these vapours are recovered by the VRU but should the VRU System shut down or lack sufficient capacity for any reason, excess vapours are collected in the LP Flare header and sent to the LP KO Drum, where liquid and vapour are separated. Vapours flows to LP Flare Stack and liquids are removed from the LP KO Drum and sent to the Surge Tank or Slop Tank.


Related Discussions:- Define flare and vru system

Define 3-d lathe tool dynamometer, Define 3-D lathe Tool Dynamometer It...

Define 3-D lathe Tool Dynamometer It is possible to measure three dimensional cutting tool component with the help of 3-D lathe tool dynamometer. In spite of that we are gone f

I want assignment on types of suspension systems, It should include 10 page...

It should include 10 pages along with pictures and references.

Explain the process for using the two small pipes, Method:- Using the two s...

Method:- Using the two small pipes - Radial Drilling machine First we make a base. Then we attach column to the base. Then show the table atmiddle of the column. Then after we

Hazardous and safe areas in plant layout, Q. Hazardous and Safe Areas in pl...

Q. Hazardous and Safe Areas in plant layout? Plants implicitly involve identifiable hazards in respect to the environment, location and presence of potentially explosive materi

Calculate the spindle speed in milling operation, Calculate the Spindle Spe...

Calculate the Spindle Speed in Milling Operation Calculate the spindle speed (N) if a copper job is to be milled by  (a) stellite cutter  (b) cemented carbide cutter.

Takt time for sand blasting, Takt Time for sand blasting:            ...

Takt Time for sand blasting:             Tatk time is crucial in manufacturing process. It determines the speed of production to produce a product. Time is money toward prod

Find out ratio of strain-energy, Find out ratio of strain-energy: A ci...

Find out ratio of strain-energy: A circular rod of diameter d and length l is fixed at one end and a torque T applied at the other. Now, if any close coiled helical spring is

Draw the bending moment diagram and shear force diagram, Draw the bending m...

Draw the bending moment diagram and shear force diagram: A cantilever beam of 8 m length is subjected to point loads of 15 kN, 10 kN, 25 kN and 20 kN at distances of 4 m, 2 m,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd