Schedule control is concerned with all of the following except:
a. Influencing the factors which create schedule changes
b. Determining that the schedule has changed
c. Resource requirement updates
d. Managing changes when and as they occur.
Solution: C - Resource planning to meet new or additional requirements is a cost management process.
Define the Predominant factor in atmospheric corrosion? The predominant factor in atmospheric corrosion in areas located above splash zone is moisture as there is an excess ava
Why we mixm pozzolona in cement
how to bulid a bilding?
definition of youngs modulus
What is Bonded Post-tensioning In post-tensioned construction, ducts, in which tendons are provided, are sometimes grouted after the stressing operation. Though the mechanism
Question Should dolphins be designed in a rigid manner such as resting on several raking piles? Answer While designing dolphins, they are normally supported on a syste
Explain the crushing strength test
Define the Influence line-beam shear? 1. Replace point of interest with a link element of nominal length. If the point of interest is a reaction, place a hinge at that poin
difference between RCC and RBC
Define Vertical Curves - Transportation 1) Vertical curves are used to change the grade of a highway. 2) Most vertical curves take the shape of an equal-tangent parabola.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd