Schedule control is concerned with all of the following except:
a. Influencing the factors which create schedule changes
b. Determining that the schedule has changed
c. Resource requirement updates
d. Managing changes when and as they occur.
Solution: C - Resource planning to meet new or additional requirements is a cost management process.
Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced
diffrence between cumilative compensative error
Q. Show the Differences Between GGBS and PFA? The use of GGBS as substitute of cement improves smaller reliance on PFA. Particularly GGBS is supposed to be more compatible with
i need journals or articles of forensic structural engineering
i dont know how to calculate moment of inerta
Derivation of Moment-Area Method
Define in biref about the Final Prestress The stress which exists after all losses of prestress have occurred substantially is known as final prestress. This may be calculated
demonstrate your understanding of the term setting out
Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction. The field moisture test finds that fi
soil sample investigation
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd