Schedule control is concerned with all of the following except:
a. Influencing the factors which create schedule changes
b. Determining that the schedule has changed
c. Resource requirement updates
d. Managing changes when and as they occur.
Solution: C - Resource planning to meet new or additional requirements is a cost management process.
Q. Paint system to protect steelwork from corrosion? In a typical painting system, there are generally three main layers primer, undercoat and finishing coat. Primer acts as th
how to use mood diagram to get f and other Re
Define Inspection of Steel or Cast Iron Substructures? Corrosion is the principal cause of deterioration in steel waterfront substructures. On bare un-protected steel pilings,
collect the field deta manualy and drw the drawing as per scale
what are the types of foundations
What is the Long Term Effects - Concrete Long term effects of loads on structures consider all the effects including creep and shrinkage.
Common defects - bituminous roads: Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt. If an overlay is to be laid on a cracke
How to do assignment on the basis of azetropic mixture
defination
Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd