Define electrical tool for underwater inspection of bridge, Civil Engineering

Assignment Help:

Define Electrical tool for underwater inspection of bridge?

Electrical equipment like Rebar Scanner for scanning of rebars; underwater sonic and ultrasonic equipment for observing voids in concrete, and thickness measurement of steel; Underwater Magnetic Particle Testing to locate and describe surface discontinuities in magnetic materials.


Related Discussions:- Define electrical tool for underwater inspection of bridge

Define overloading - deterioration in steel, Define Overloading - Deteriora...

Define Overloading - Deterioration in Steel? Steel structural elements are sensitive to impact damage from moving vessels and other types of accidental overloading. Impact or c

Write short notes on aqua privy latrine, Q. Write short notes on Aqua Privy...

Q. Write short notes on Aqua Privy Latrine? There are a sort of latrines also called septic tank latrines. These are constructed over septic tanks & flushing is also provided.

How to do deflection calculations, How to do deflection calculations Ba...

How to do deflection calculations Basic values of span to effective depth ratios for spans upto 10m may be taken as 7, 20 and 26 for cantilever, simply supported and continuous

Loss of prestress due to elastic shortening, Loss of prestress due to elast...

Loss of prestress due to elastic shortening At the transfer of prestress, tensile stresses of tendons are transferred to concretc in the form of compressive stresses. Due to t

Estimate the jam density in one lane of trucks, At a large port facility ne...

At a large port facility near New York City tractor-trailer trucks are lined-up in long queues as their drivers wait to have their containers inspected and documents processed.  As

Define the vapor pressure, Define the Vapor Pressure The partial pressu...

Define the Vapor Pressure The partial pressure exerted at the surface of a liquid at the liquid/vapor interface. The liquid molecules are released into the vapor phase when the

Determine condition of activity in the network flow diagram, Determine the ...

Determine the condition of each activity in the network flow diagram shown below   Ans: a. Activity C can be started only after the completion of activities A and

Concrete surround for drainage pipes, Concrete surround is generally adopte...

Concrete surround is generally adopted for rigid drainage pipes to resist high traffic loads (for instance under shallow covers) and to allow for using pipes with lower strength. F

Define the frame column analysis, Define the Frame Column Analysis 1. B...

Define the Frame Column Analysis 1. Based on if a column section is a braced frame or unbraced frame. 2. Braced frame-indicates buckling mode shape does not involve tr

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd