Define conceptual engineering phase for project, Mechanical Engineering

Assignment Help:

Q. Define Conceptual Engineering Phase for project?

The primary objective of this stage is to include and clearly define the economic feasibility of the project, sensitivity to capital and operating cost, feedstock/ product pricing and start-up timing. The Customer normally carries out activities during this project phase; however, the Customer will occasionally request Colt to carry out some of the required tasks.

The Customer must identify all the critical project elements, risks, assessments, timing and economics associated with a business plan to develop an opportunity. Initially, focus is on the "why" a business opportunity should be pursued and not technical details that are better suited for the forthcoming Design Basis Memorandum.


Related Discussions:- Define conceptual engineering phase for project

Tension testing, The first laboratory report, covering the two-part exercis...

The first laboratory report, covering the two-part exercise involving tension testing and stress concentrations is due in lab two weeks after the conclusion of fatigue testing.

Characteristics of computer controlled scheduling (ccs), Characteristics...

Characteristics  Of  Computer  Controlled Scheduling (Ccs) To control the manufacturing system in an effectual way, the system is normally composed in a task-based hierarchy. T

Lubricating system, what are the functions of a lubricating system

what are the functions of a lubricating system

Shear force and bending moment, Shear Force and Bending Moment: Shea ...

Shear Force and Bending Moment: Shea r Force (S.F.) Algebraic sum of all vertical forces at any section of beam to the right or left of the section is known as shear for

Find the resultant hydrostatic force, Question. Consider the triangular lam...

Question. Consider the triangular laminar D for given b and h shown below. (a) Find x L (s) and x R (s), the left and right ends of the elementary strip, of thickness ds, a

Evaluate the speed of wheels, a) An epicyclic gear have three wheels A, B a...

a) An epicyclic gear have three wheels A, B and C. Wheel A has 72 internal teeth, wheel C has 32 external teeth. The wheel B gears with both A and C is carried on an arm which move

Determine a static feedforward controller, By operation of the distillation...

By operation of the distillation columns you are often interested to maintain output despite fluctuations in the composition, ex. feed composition and feed flow. One possible actua

Determine the location of the hydraulic jumps - water depths, Problem: In H...

Problem: In HEC-RAS, model this system as 1 reach with cross-sections every 2 ft. For all 3 discharges (labeled as: design, low, flood), (a) Determine the water depths 10 ft fro

Material engineering, State the four classes of engineering materials 3 (b)...

State the four classes of engineering materials 3 (b) Identify the class which each of the following materials belong to. Present your answer in table form Silicone, concrete, chro

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd