Define Cleaning for Underwater Inspection of Bridge?

Before any structure can be inspected, it is necessary to expose the surface material of the structure. Wherever there is marine growth or incrustation on the surface of the structure, cleaning of the same, may be in a limited area, will be required.

The best approach is to restrict cleaning to small zones, which are:

- Structurally critical areas

- Areas known to frequently deteriorate for that specific structural configuration

- Areas randomly selected to statistically lower the probability of overlooking damage

Bridge Inspector's Training Manual of FHWA, USA recommends a 15 to 30 cm bands or squares depending on the size and shape of the structure. Highest priority should be placed on locations near the low water line and connecting elements. If feasible, location at the mud line, and midway between the mud line and low water line should also be included. For large elements, squares around the perimeter should be chosen at effective intervals.

Light cleaning can be done with a diver's knife or with hand held tools such as a chipping hammer or a scraper. Cleaning of thick, hard growth will require pneumatic or hydraulic powered chippers, grinders and brushes. Tough cleaning jobs on concrete and steel may require high- pressure blaster.


Related Discussions:- Define cleaning for underwater inspection of bridge

Mortar mechanism vs stone contact mechanism, "Mortar mechanism" vs. "stone ...

"Mortar mechanism" vs. "stone contact mechanism" in bituminous materials 'Stone contact mechanism' applies to well graded aggregates coated with bitumen (for example dense bit

Quality control in flexible pavements, Quality Control in Flexible Pavement...

Quality Control in Flexible Pavements: The quality control needed for Flexible Pavements covers the following tests : (a) Density and Moisture content of sub-grade. (b)

Recognize the losses of prestress, Recognize the losses of prestress Re...

Recognize the losses of prestress Recognising the losses of prestress which take place after the prestressing OF concrete structural elements, it is to be appreciated that pres

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

BESHOOOOO, what are the dimensions of a sheet of paper required for plottin...

what are the dimensions of a sheet of paper required for plotting a traverse ABCDE with 1 : 250 scale if a margin of 4 cm to the right and left sides and a6 cm margin to the other

Strength of Materials , Need to know about compressive strength test and te...

Need to know about compressive strength test and tensile strength test of cement

Keywords of road pavements, Keywords of Road Pavements: Pavement : T...

Keywords of Road Pavements: Pavement : That part of a road which structurally supports the vehicles travelling on a road. Flexible Pavement   : A layered system of pave

Rcc and rbc, types mixing,curing,water cement ratio,qualities and workabili...

types mixing,curing,water cement ratio,qualities and workability

Quality control of concrete roads, Quality Control of Concrete Roads: ...

Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd