Define Alkali Aggregate Reaction - Chemical deterioration?

Sometimes high alkali cement reacts with minerals in certain aggregates and forms expansive compounds resulting into swelling of concrete which may cause cracking and spalling.


Related Discussions:- Define alkali aggregate reaction - chemical deterioration

Concrete with crush sand, what precaution taken during the mixing of crush ...

what precaution taken during the mixing of crush sand in winter season

Estimate the jam density in one lane of trucks, At a large port facility ne...

At a large port facility near New York City tractor-trailer trucks are lined-up in long queues as their drivers wait to have their containers inspected and documents processed.  As

Calculate the degree of saturation, A sample of clay taken from a natural s...

A sample of clay taken from a natural stratum was originated to be partially saturated and when tested in the laboratory gave the following results. Calculate the degree of saturat

Slope IN Civil, How to calculate the slope in civil engineering?????

How to calculate the slope in civil engineering?????

Uses of medain mode and mean, what is the uses of mean mode and medain in c...

what is the uses of mean mode and medain in civil engineering

Plane table surveing, in plane table surveying which activity is done first...

in plane table surveying which activity is done first whether centering or levelling?

Retaining walls, Retaining Walls: Needed to retain the fill portion, a...

Retaining Walls: Needed to retain the fill portion, and generally constructed in dry stone masonry with pucca bunds (Figure). Figure: Typical Design for a Retaining

Centroid, How to calculate the centroid of parabola?

How to calculate the centroid of parabola?

Design the water supply system a high service tank, Q. There is a railway c...

Q. There is a railway colony of 500 house holds source of water is from a tube well 800 m away. The colony is 10 m higher then the ground at source. Tube well is 60 meters deep. De

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd