When is RTM (Requirement traceability matrix) prepared - after or before test case designing?
- RTM is prepared before test case designing.
- Requirements must be traceable from Review activities as traceability must be there in Test Plan.
- If company does testing after development has started then requirements must be traceable to their source.
Differentiate between failures and faults. Failure:- Failure is the departure of external results of program operation from requirements. So failure is dynamic. Failure can
A document reporting on any event that happens during testing that needs further investigation.
Structure chart: A structure chart is a top-down modular design tool, constructed of squares representing the dissimilar modules in the system, and lines that connect them. The l
A manual testing [error detection] method where program [source code] logic [structure] is traced manually [mentally] by a group with a small set of test cases, whereas the state o
Explain Horizontal partitioning 1. Explains separate branches of the. 2. Propagaton of fewer side-effects 3. Software is simpler to maintain
Distinguish between verification and validation. Verification refers to the set of activities that make sure that software correctly executes a specific function. Validation re
we got the code for mobile app we need a document for that
RE-ENGINEERING:- It is re-organizing and changing existing system to make them more maintainable. It includes:- Source code translation. Program structure development
Q. What are basic Key process areas in CMM? Ans) Key Process Areas (KPAs) adds the areas an organization could focus to improve its software process to the next level. Except f
What is the meaning of SCM? Software Configuration Management is termed as a set of actions performed for identifying, organizing and controlling changes throughout the lifecyc
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd