Question:
Spencerville Products is expanding its operations west of the Mississippi. Its first step is to build a manufacturing facility in Denver to satisfy demand on the West Coast. Spencerville has an option to build either a large facility that has an annual output of 500,000 units per year or a smaller facility with an output of 250,000 units per year. It must build one of these two facilities - it does not have any other options.
The expected demand for the company's products is shown as either high or moderate in the table below:
Demand Level Annual Demand (units/year) Probability
High 450,000 0.4
Moderate 150,000 0.6
The small facility has a profit of $5.00 per unit. The large facility has a profit of $4.00/unit.
a) What size facility should Spencerville Products build based on expected values and using a decision tree approach? You must also provide the decision tree using the appropriate decision tree symbols.
b) Suppose that the company is not certain about the 450,000 projection for the High Demand scenario. It could be higher than this projection. How sensitive is the selection in a) to the High Demand projection. In other words, at what annual demand for the High Demand scenario would the company be indifferent between the two size facilities?
A paper mill products two grade of paper viz., X & Y. Because of raw material restriction, it cannot produce more than 400 tons of grade X paper & 300 tons of grade Y paper in a we
Minimization Example A farmer is advised to utilize at least 900 kg of mineral A and 1200 kg of mineral B to increase the productivity of crops in his fields.
Inflation Inflation is a general increase in the price of goods and services. The inflation rate, as measured by the
how to solve operation research optimization questions
Scope of operation research?
Introduction to Probability Distribution By theoretical distribution we mean a frequency distribution which is obtained in relation to a random variable by some mathem
Maximize Z =3x+4x subject to x1+x2 =3 2x1+3x2 =4 x1,x2 =0
Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment
An operation is a combination of different actions dealing with raw materials( e, g, men and machines) which form a structure from which an action with regard to broader ob
how does it work
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd