Decision tree approach, Operation Research

Assignment Help:

Question:

Spencerville Products is expanding its operations west of the Mississippi.  Its first step is to build a manufacturing facility in Denver to satisfy demand on the West Coast.  Spencerville has an option to build either a large facility that has an annual output of 500,000 units per year or a smaller facility with an output of 250,000 units per year.  It must build one of these two facilities - it does not have any other options.

The expected demand for the company's products is shown as either high or moderate in the table below:

Demand Level                        Annual Demand (units/year)                       Probability

High                                        450,000                                                    0.4

Moderate                                 150,000                                                    0.6

The small facility has a profit of $5.00 per unit.  The large facility has a profit of $4.00/unit.

a) What size facility should Spencerville Products build based on expected values and using a decision tree approach?  You must also provide the decision tree using the appropriate decision tree symbols.

b)  Suppose that the company is not certain about the 450,000 projection for the High Demand scenario.  It could be higher than this projection.  How sensitive is the selection in a) to the High Demand projection.  In other words, at what annual demand for the High Demand scenario would the company be indifferent between the two size facilities?

 


Related Discussions:- Decision tree approach

Methods of survey and study, Methods of Survey and Study:   Some method...

Methods of Survey and Study:   Some methods of collecting information about the organisation and about the information requirement of potential users are mentioned below. No si

Dynamic programming, A company is planning its advertising strategy for the...

A company is planning its advertising strategy for the next year for its three major products.

Ans, A paper mill produces two grades of paper viz., X and Y. Because of ra...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

LPP using Simple method, Maximize Z= 3x1 + 2X2 Subject to the constraints: ...

Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

the simplex method, In large sized linear programming problems, the ...

In large sized linear programming problems, the solution cannot be obtained by the graphical method and hence a more systematic method has to be developed to find

Sample survey methods:, Sample Survey Methods: If proposed investigati...

Sample Survey Methods: If proposed investigation is done  only on  a part taken  out of  universe then it  will be  known  as sample  survey. This  part of the universe is kno

Operation Research.., 3. Explain ‘Vogel Approximation Model (VAM)’.? answer...

3. Explain ‘Vogel Approximation Model (VAM)’.? answer please

Explain the competitive environment of a company, 1) Provide an overall des...

1) Provide an overall description of the business and the competitive environment in which it operates.  You should describe: a) what type of business it  is (e.g. retail, manuf

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd