Debate over answer to an equation..., Mathematics

Assignment Help:
The math equation is written exactly this way: 0+50x1-60-60x0+10=???
The answer I get is 10 and others say 0
0+50=50
50x1=50
50-60=-10
-10-60=-70
-70x0=0
0+10=10

Related Discussions:- Debate over answer to an equation...

Rolles theorem, Rolle's Theorem  Assume f(x) is a function which satis...

Rolle's Theorem  Assume f(x) is a function which satisfies all of the following. 1. f(x) is continuous in the closed interval [a,b]. 2. f(x) is differentiable in the ope

Two circles touch each other externally, Two circles touch each other exter...

Two circles touch each other externally: Given: Two circles with respective centres C1 and C2 touch each other externaly at the point P. T is any point on the common tangent

Algebra ii, How do you graph a hyperbola?

How do you graph a hyperbola?

Geometric mean, When three quantities a, b and c are in G.P., t...

When three quantities a, b and c are in G.P., then the geometric mean "b" is calculated as follows. Since these quantities are in G.P., the r

Area under curve, Write a program to find the area under the curve y = f(x)...

Write a program to find the area under the curve y = f(x) between x = a and x = b, integrate y = f(x) between the limits of a and b. The area under a curve between two points can b

Error in measurement, what is actual error and how do you find percentage e...

what is actual error and how do you find percentage error

Monotonic, Monotonic, Upper bound and lower bound Given any sequence {a...

Monotonic, Upper bound and lower bound Given any sequence {a n } we have the following terminology: 1.   We call or denote the sequence increasing if a n n+1 for every n.

Operation on polynomial, Perform the denoted operation for each of the foll...

Perform the denoted operation for each of the following.  (a) Add 6x 5 -10x 2 + x - 45 to 13x 2 - 9 x + 4 .   (b) Subtract 5x 3 - 9 x 2 + x - 3 from       x 2+ x +1.

Find the annual percentage yield, 1.   Find the APY for the bank described ...

1.   Find the APY for the bank described below- A bank offers an APR of 4% compounded monthly. 2.  Use the compound interest formula to compute the balance in the following a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd