Database definition - micro cds/isis application, Software Engineering

Assignment Help:

Database Definition:

There are four basic steps involved in defining a database. They are: 

i)  Creating a Field Definition Table (FDT) : The possible content of data records should be determined in a Field Definition Table (FDT). This table is set up by using The Line Editor of micro CDS/ISIS. Tag number, name, maximum length, repeatability end possible sub-field identifiers are to be specified for each field. 

ii)  Creating a Data Entry Worksheet: The default data entry worksheet is to be compiled, Worksheet editor facilitates this job. Separate worksheets can be compiled to suit different requirements using the facilities of worksheet editor. 

iii)  Defining the Display/Print Formats : A default display/print format has to be specified. The output sequence and layout of the fields are to be described with the help of Print Formatting Language. This language is used throughout the system to specify field manipulations. Separate display formats can be specified as per the requirement.  


Related Discussions:- Database definition - micro cds/isis application

Determine the use of architectural design, What is the use of Architectura...

What is the use of Architectural design? The Architectural design defines the relationship between major structural elements of the software, the "design patterns" that may be

What is dynamic and static metrics, What is Dynamic and static metrics? ...

What is Dynamic and static metrics? Dynamic metrics are closely related to software quality attributes It is relatively easy to measure the response time of a system (per

Dfd, online admision application

online admision application

State the term- code coverage, State the term- Code Coverage This is a...

State the term- Code Coverage This is an analysis method that determines which parts of software have already been covered by test case suite and which are remaining.

What is volume testing, Testing designed to challenge a system's capability...

Testing designed to challenge a system's capability to handle the maximum amount of data over a period of time. This type of testing also classify a system's ability to handle over

Calculate the peak manning time, Q. Consider a project for which the manpow...

Q. Consider a project for which the manpower requirement is 200 PY and the development time is 2 years. calculate the peak manning time. Ans Software Project cost K=200 PY

Explain the capability maturity model, Explain the CAPABILITY MATURITY MODE...

Explain the CAPABILITY MATURITY MODELS Process models are based on various software development phases while capability models have an entirely different foundation of developm

What is up time, What is Up time? "Up time" is the time period when a me...

What is Up time? "Up time" is the time period when a method is operational and in service. Up time is the sum of idle time and busy time.

What is scm, What is SCM? Software Configuration Management is a set of...

What is SCM? Software Configuration Management is a set of activities carried out for identifying, organizing and controlling alters throughout the lifecycle of computer softwa

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd