Cross-subsidy:
The policy gives clarity on determination of cross-subsidy and additional surcharges for open access to consumers and lays down a timeframe for rationalization of electricity tariffs and decrement of cross- subsidies. It also lays down the formula for computation of cross-subsidies. Consumers below the poverty line and consuming a little quantity of electricity should continue to receive special support by cross-subsidised tariffs. To provide a choice of supply to the consumers, the tariff policy enunciates a facilitative framework for calculating cross-subsidy surcharge. It also lays down a mechanism for arranging backup supply for such consumers.
Multi-year tariff:
The multi-year tariff (MYT) framework is to be adopted for any tariffs to be denotes from April 1, 2006 along within incentives and disincentives for better performance. The move towards multi-year tariffs also involves regulatory certainty. An investor could now understand with reasonable certainty the future course of action and direction of tariffs and therefore make better investment decisions. Gains from effective operations are to be shared along with consumers. Continued and proven inefficiency must be penalized and controlled.
solar
write a short notes of thermal compansation?
Name some application where you see use of serial communication. Within the world of serial communications, there are two different equipments are: DTE stand for Data Termin
Q. For the low-pass filter configuration of Figure, with R i = R f = 1M, calculate C f such that the 3-dB point is at 1 kHz.
Tools for Power Supply The several universal tools those could be applied in the power-sector for the improvement of organizational efficiency and effectiveness. These tools v
How to work ring counter?
Q. What is Traffic Engineering? Traffic engineering provides the foundation for analysis and design of telecommunication network to carry a given traffic at a particular loss p
The following data apply to a 100-kW, 250-V, six-pole, 1000-r/min long-shunt compound generator: no-load rotational losses 4000 W, armature resistance at 75°C = 0.015 , series-fie
Simbulation
principle and operation of 3phace induction motor
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd