The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd3) between section 83+65.6 and 85+98.5 is most nearly:
Solution:
Distance between the stations is: 83+65.6 and 85+98.5 = 232.9-ft
By definition, use the Prismoidal formula when the two end areas differ significantly (in this case, the two end areas differ by more than 20%) it also provides the more precise calculation when compared against the average end area:
Volume = 232.9 [3287 + (4) (3956) + 4180] ÷ [(6)(27)= 33,484-yd3
Surface runoff travelling over ground surface to reach receiving water involves the following events: i) Rainfall intensity exceeds soil's infiltration rate; ii) Excess water
Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction
Scenario: You are working for a structural engineering firm and you have been assigned the task of computing the code checks on a new structural design. Though another commercial p
A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute
Formula of the included angle of the bearings?
Explain CERCLA and SARA - Hazardous Waste Regulations In 1980, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted to address tho
properties?
Determine the latitude and departure of each side of the closed traverse ABCDA. Total the latitudes and departures. TIP: For Closed Traverse, Sum of Latitudes is Z
Q. Illustrate Bituminous surfacing over concrete structures? Usage of bituminous surfacing over concrete structures (for instance existing concrete roads) is widespread to impr
http://www.expertsmind.com/engineering-homework-assignment-help.aspx
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd