Cross sectional area to be excavate for roadway construction, Civil Engineering

Assignment Help:

The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd3) between section 83+65.6 and 85+98.5 is most nearly:  

30_Cross sectional area to be Excavate for Roadway Construction.png

Solution:  

Distance between the stations is: 83+65.6 and 85+98.5 = 232.9-ft

 By definition, use the Prismoidal formula when the two end areas differ significantly (in this case, the two end areas differ by more than 20%) it also provides the more precise calculation when compared against the average end area:   

Volume = 232.9 [3287 + (4) (3956) + 4180] ÷ [(6)(27)= 33,484-yd3


Related Discussions:- Cross sectional area to be excavate for roadway construction

Define mechanical tool for underwater inspection of bridge, Define Mechanic...

Define Mechanical tool for underwater inspection of bridge? Mechanical devices that involves a Schmidt Test Hammer for computing concrete surface hardness, and rotary coring eq

Construction of passenger terminal building, Construction of Passenger Term...

Construction of Passenger Terminal Building: There are various concepts in planning and constructing passenger terminal buildings. These are : (a)        The international

Bitumen, unit of kinematic viscosity

unit of kinematic viscosity

Calculate the benefit-cost analysis ratio, Calculate the Benefit-Cost Analy...

Calculate the Benefit-Cost Analysis Ratio A city engineer is deciding which of two alternatives to select.  If the interest rate is 10% per year, the Benefit-Cost analysis rat

Torsion, assumptions made in the simple torsion theory

assumptions made in the simple torsion theory

Tests on bricks, Tests on Bricks The following laboratory tests can be...

Tests on Bricks The following laboratory tests can be conducted on the bricks to find their suitability: 1.    Crushing strength 2.    Absorption 3.    Shape and size

The covers of electrical machines are made of what materials, The covers of...

The covers of electrical machines are made of what materials ? Answer: It is made of  soft magnetic materials.

Problems formed while design of pre-stressed concrete, Determine the proble...

Determine the problems formed while design of pre-stressed concrete Two types of problems are encountered by  the engineer engaged in the design of pre-stressed concrete membe

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd