The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd3) between section 83+65.6 and 85+98.5 is most nearly:
Solution:
Distance between the stations is: 83+65.6 and 85+98.5 = 232.9-ft
By definition, use the Prismoidal formula when the two end areas differ significantly (in this case, the two end areas differ by more than 20%) it also provides the more precise calculation when compared against the average end area:
Volume = 232.9 [3287 + (4) (3956) + 4180] ÷ [(6)(27)= 33,484-yd3
Types and components of pavement
confusion on shear force diagram, bending moment diagram
rolling steel door
preparation and uses of concrete
methods of damp proofing
What are different type of foundation and their suitablity
Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o
Hello I have an assignment due feb 1st at 3 pm. I wanted to know if it was possible that it gets solved
Define the Influence line-beam shear? 1. Replace point of interest with a link element of nominal length. If the point of interest is a reaction, place a hinge at that poin
Define Dual frequency and colour fathometer - Sounding/Sensing Devices? Dual Frequency and Colour Fathometers can be used to detect refill in the scoured area since more than o
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd