Cross Drainage Works:
Culverts
A large number of culverts are needed for taking care of the streams crossing the railway lines. The culverts can be one of the following types:
(a) Masonry arch
(b) Brick arch
(c) RCC slab
(d) RCC box
(e) RCC pipes
Bridges
Bridges are provided across rivers crossing the railway line. The types of bridges used are:
(a) RCC slab
(b) RCC T-beam and slab
(c) Pre-stressed Concrete beam
(d) Steel plate girders
(e) Steel truss girders (for long spans)
The foundations are either open foundations or well foundations (for long spans). The piers and abutments are constructed in masonry, mass concrete or RCC.
The waterway for the bridges is fixed carefully after calculating the maximum possible discharge. Adequate clearance is provided over the highest flood level upto the bearings to take care of floating trees.
what is equivalent evaporation
A positive displacement pump is a liquid or gas to move by trapping a fixed amount of fluid or gas and then forcing (displacing) that trapped volume into the discharge pipe. Positi
Explain Principle of Design of Jig and Fixture While designing jigs and fixtures following considerations should kept in mind: Reduction of idle time. Rigidity
The Cu-Sb system contains 2 eutectics, 1 eutectoid, 1 peritectic and 1 peritectoid. Mark them all on the figure, write down the temperature and composition of each point, and ident
Concept of centrifugal tension: Explain concept of centrifugal tension in any belt drive. What is main consideration for taking maximum tension? Sol: T he belt continuo
parllelo gram law
Evaluate the motion of the system: If in above Example, the block A is resting on an inclined plane at 45 o to horizontal as illustrative in Figure, find out the motion of th
how to find out hte optimal sequence and determine the minimun total elapsed time associated with a given problem
Normal 0 false false false EN-IN X-NONE X-NONE MicrosoftInternetExplorer4
Dismantle crank case and explode main shaft , counter shaft, gear shifter drum and kick spindle assembly and check sequence of parts fitment while dismantling: Check all gear teeth
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd