Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The overall size of the crane must not be changed. The height and reach of the loading point is to remain the same . Original parts must remain and you are allowed additions such as corner plates, , bracing , re-enforcing etc. The maximum stress level of any component needs to be less than 75 MPa. If you can't maintain the max. stress level under the specific level, you need to justify it Also you need to limit the vertical and horizontal displacement at the loading point less than 50 mm.
Create a suitable model with beam elements and perform an FEA for:
1. Original crane arrangement
2. Modified crane arrangement
classification of furnace
Illustrate the terms : (i) State (ii) Process and (iii) Cycle What is a quari static process ? Illustrate with an example. What are point function and path function.
Working of Telescopic Hydraulic Fork: When a road shock exerts on to the suspension system it is transmitted to the spring instead of motorcycle frame and the spring starts to o
The turbine rotor of a ship having a mass of 200Kg moves at 200 r.p.m and its radius of gyration is 0.30 m. If the rotation of the rotor is clockwise looking from the aft., evaluat
Illustrate various kinds of control systems. Illustrate several block diagram reduction rules with examples. Determine C/R by using block diagram reduction method.
The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535
The Linear Dimension Command You can use this command to generate horizontal and vertical dimensions.Creating a linear dimension is eas
Q. Postweld heat treatment? When the equipment data sheet specifies post-weld heat treatment either for service conditions or code requirements, welding, hammering (peening), o
definition and description
Q. Surface Preparation and Coating? Vendor shall chemically clean all foreign material and commercially sandblast (SSPC-SP-10) mill scale and rust from all surfaces to be paint
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd