Q. Corrosion Assessment of Flare and VRU System?
The worst case scenario shall be considered during material selection of Flare KO Drums. Depending on the fluid composition entering the flare header and the liquid composition collected in the Flare KO Drum, it may be corrosive to CS material.
Corrosion shall be studied on a case by case basis and normal prevention method is to increasing the CA of Flare KO Drum (normally up to 4.8mm or 6.4mm for severe cases) or applying internal coating. Operating temperature shall be considered when specifying internal coating.
As there is always a liquid water phase present in the system, there is risk for wet H2S corrosion up to the Flare KO Drum. It is highly recommended to consider NACE requirement for the Headers and Flare KO Drums. HP KO Drum is recommended to receive PWHT to minimize risk of SSC and SOHIC. Clean steel shall also be used to reduce the risk of HIC. There is no need to use HIC resistant materials.
Dew point corrosion shall be considered by relevant vendor. Flare Tip shall be upgraded to 310SS to prevent high temperature oxidation and cold end corrosion.
The condensing phase prior to compression in VRU package is primarily water. Depending on the gas composition (CO2/H2S ratio), upgrading the metallurgy to 316L SS may be necessary. The entire VRU package shall be in full compliance with NACE requirements.
Q. Explain about water De-Oiling process? The De-Oiling process consists of three major components: The Surge and Skim Tank which reduces PW oil content to 100 ppm I
1. I have a data for displacement versus time ( graph) then I want to get the velocity and acceleration graphs from the displacement.How can I get it?
A Mercedes-Benz 300SL (m = 1600 kg) is parked on a road that rises 20° above the horizontal. (a) What is the static frictional force that the ground exerts on the tires? (b) Wh
Q. Show Corrosion of BFW Pump? BFW pumps are in high-pressure high-temperature service and may be subject to cavitation and erosion-corrosion. Also overheating of these pumps i
A Double shoe brake is capable of absorbing a torque of 1400 N-m. The diameter of the brake drum is 350 mm and the angle of contact for each shoe is 100 o . if the coefficient of f
Inspection of Tyres STEPS Both the tyres are checked for free rotation. Loose spokes are to be tightened. At the same time it is checked that the tyre is not dam
Find out load carried and compressive stress: The concrete column 300mm x 300mm in section can be reinforced by 10 longitudinal 20mm diameter round steel bars. The column car
Kineti c (Dynamic) Friction: When applied force exceeds limiting friction the body starts moving over the other body and the friction of resistance experienced by the body a
Q. Show Material selection process? • Design life shall be based on project design criteria and normally 10 to 15 years' service life specified for well pads, 20-25 years for C
In motorcycle servicing we studied about various service tips for motorcycle servicing. These steps will ensure proper servicing of motorcycle and as a result customers will trust
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd