Construction of concrete carriageway, Civil Engineering

Assignment Help:

Question

If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted?


Answer

If construction of concrete carriageway is carried out in summer, extension joints could not be necessary. Extension of concrete carriageway is primarily due to seasonal changes with an enhancement in temperature from which during construction to ambient temperature. However, if construction of concrete carriageway takes place in summer, concrete carriageway will undergo contraction in next winter, thus space available in contraction joints be capable of accommodate future expansion in next summer.

 


Related Discussions:- Construction of concrete carriageway

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

The ferromagnetic materials loos property at , The ferromagnetic materials ...

The ferromagnetic materials loos property at which point? Answer: At Curie point it loos property

Raking piles of bridge abutment placed under an embankment, Question It sho...

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div

Graduate, fabrication methods of ironmongery

fabrication methods of ironmongery

Derive, Derived condition of economic span of bridge

Derived condition of economic span of bridge

Theodolote, List out the permanent adjustments of dumpy level.

List out the permanent adjustments of dumpy level.

Aluminium sliding window detail drawings, what are the details of aluminium...

what are the details of aluminium sections and how are they connected for making a door or window

Explain the statements about the critical path method, 1. Determine a netwo...

1. Determine a network diagram method that uses only finish-to-start relationships and may use dummy activities to define logical relationships.  2.  Precedence diagr

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd