4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Can u give me a sample assignment, im newer to the courses so i would like ...

im newer to the courses so i would like to know about the assignment types. in this case can u please show me a sample assignment?

Unsealed contraction joints in concrete pavement, Unsealed contraction join...

Unsealed contraction joints in concrete pavement For unreinforced concrete pavement, contraction joint is an approximately 3mm wide groove with a depth of about one-third to o

Determine the head loss due to friction, Determine the head loss due to fri...

Determine the head loss due to friction using the Darcy-Weisbach equation. The water is pumped at 3.0 gallons per minute, has a temperature of 60 °F and is pumped through a 1inch s

Planning of water transport facilities, Planning of Water Transport Facilit...

Planning of Water Transport Facilities: Definition of Terms In water transport system, a number of terms are used. It is necessary for a civil engineer to know the pr

Surface drainage, Surface Drainage: Surface drainage deals with arran...

Surface Drainage: Surface drainage deals with arrangement for quickly leading the water from rainfall away from the surface of pavements, shoulders, slopes of embankments and

Determine difference between stations in feet and in station, The survey ha...

The survey has identified the beginning and ending points along an urban arterial highway that require new sidewalks. The first station is located at 5+88 and the second station is

What do you mean by ozone test, Q. What do you mean by Ozone Test? Some...

Q. What do you mean by Ozone Test? Some research and studies determined that the ozone test was unnecessary as this affects only the surface layer.  In un-stretched rubber, ozo

Mensuration, My team has to construct a swimming pool at the back of the ho...

My team has to construct a swimming pool at the back of the house. It’s interior dimensions are 10M x 3M and 1M at the shallow end and 2.5M at the deep end. The walls and the bas

Proctor test for GSB material, what is the procedure for gsb proctor test f...

what is the procedure for gsb proctor test for matrial sampling for lab density

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd