4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Waterway, What is linear waterway?

What is linear waterway?

What are the conditions essential for darcy law, What are the conditions es...

What are the conditions essential for Darcy's law to be applicable for flow of water by soil ? Why is the permeability of a clay soil with flocculated structure greater than tha

Dual frequency & colour fathometer - sounding/sensing device, Define Dual f...

Define Dual frequency and colour fathometer - Sounding/Sensing Devices? Dual Frequency and Colour Fathometers can be used to detect refill in the scoured area since more than o

Atomic weight of an atom is equal to, Atomic weight of an atom is equal to?...

Atomic weight of an atom is equal to? Answer: sum of the number of protons and neutrons.

Find the youngs modulus of the rod, Find the Youngs modulus of the rod: ...

Find the Youngs modulus of the rod: A composite rod is made by joining a copper rod end to end with a second rod of different material but of same cross-section. At 25oC, the

Explain the properties of poly tetra fluoro ethylene, Explain the Propertie...

Explain the Properties of Poly Tetra Fluoro Ethylene? PTFE is a linear chain polymer of great molecular strength, known for its chemical inertness and low coefficient of fricti

State the effect of the induction of the pre-stresses, State the effect of...

State the effect of the induction of  the pre-stresses The net effect of the induction of  the pre-stresses shall be to decrease the tensile stresses (produced due to the exte

BRIDGES, WHAT ARE THE DIFFERENT TYPES OF BRIDGES

WHAT ARE THE DIFFERENT TYPES OF BRIDGES

Explain equation for change interval, Explain equation for Change Interval ...

Explain equation for Change Interval y = t + v / 2a + 64.4G Where:  y = length of yellow interval (sec)     t = driver perception/reaction time (1.0 sec generally used)

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd