construction material, Civil Engineering

Assignment Help:
4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Define the fatigue failure - underwater inspection of bridge, Define the Fa...

Define the Fatigue failure - underwater inspection of bridge? Fatigue failure results in the fracture of structural members as a consequence of repeated high loading.  Fatigue

Foundation at Different Levels, Foundation at Different Levels on soft rock...

Foundation at Different Levels on soft rock. what is minimum distance in two between footing ?

What is unimat machine, Q. What is Unimat Machine? The machine has got ...

Q. What is Unimat Machine? The machine has got 16 independently tiltable tamping tools which enable the machine to work on points and crossing as well as on plain track. The ma

Project management, know the planking and strutting for shallow excavation...

know the planking and strutting for shallow excavation

Role of rebate in typical construction joint, Question What is role of reba...

Question What is role of rebate in typical construction joint ? Answer Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constr

Epoxy-coated bars vs galvanized bars, Bonding performance to concrete: Epox...

Bonding performance to concrete: Epoxy-coated bars vs. galvanized bars  Based on the findings of CEB Bulletin 211 the bonding of galvanized bars to concrete is lower in early

Key mechanism of defence by hot dip galvanizing, Question What is key m...

Question What is key mechanism of defence by hot dip galvanizing ? Answer Hot dip galvanizing protects steel or iron from corrosion by- (i) It figures a metallic z

Spalling reinforcement for pre stressing works, Spalling reinforcement for ...

Spalling reinforcement for pre stressing works in anchor blocks Reinforcement of anchor blocks in prestressing works usuallycomprises equilibrium reinforcement, bursting reinfo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd