4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

What is preset mean while installation of bridge bearings, What is preset m...

What is preset mean while installation of bridge bearings ?

Moment of Inertia of a T Beam, Calculate the moment of inertia and section ...

Calculate the moment of inertia and section modulus (top and bottom of the beam) about the z-axis of the beam cross section of Fig.

Preparation for underwater inspection - tool and equipment, Preparation for...

Preparation for Underwater Inspection - Availability of Tools and Equipment The engineer-in-charge, before taking up the inspection, should list out the complete equipment req

Project, I want to do project using ul design directory

I want to do project using ul design directory

What are the uses of groynes, They stop, or slow down erosion, and stop lon...

They stop, or slow down erosion, and stop long shore drift. This, though, can have bad knock-on effects somewhere near.

Stacking of materials for building, briefly explain the stacking of materia...

briefly explain the stacking of materials in the site for general building?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd