4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

What is codal provisions, According to National Building Code (Sp:7 1970), ...

According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist

Calculate the number of trucks for fleet working, A contractor was awarded ...

A contractor was awarded a Contract to excavate and haul 200,000-yds 3 of silty clay (USCS classification ML) with a bulking factor of 30%.  The contractor's fleet of dump trucks

Which are the colloidal impurities in water, Q. Which are the Colloidal Imp...

Q. Which are the Colloidal Impurities in water? The finely divided particles of soil such that their small quantities are not Visible to the naked eye are

Define latitude - transportation, Define Latitude - Transportation Lati...

Define Latitude - Transportation Latitude of a line is the distance that the line extends in a north or south direction. A line that runs towards north has positive latitude; a

Calculate the concrete tensile strength, Calculate the concrete tensile str...

Calculate the concrete tensile strength A 6 in. by 12 in. concrete cylinder resisted a transverse force of 55,000-lbf, at 28 days, in a split tensile cylinder test. Calculate t

Explain the normal depth equation, Explain the Normal Depth Equation T...

Explain the Normal Depth Equation The equation is derived from the Chezy-Manning equation. As written below it determines the diameter of a circular storm or sanitary sewer wh

Define the disintegration - underwater inspection of bridge, Define the Dis...

Define the Disintegration - underwater inspection of bridge? Disintegration of concrete may be defined as the deterioration of concrete into small fragments or particles result

Determine the Critical Euler Buckling Load, a) Determine the critical Eule...

a) Determine the critical Euler buckling load of a solid aluminium rod of 12 mm diameter if it has a length of 1.0 m between pin-ended supports. (E = 70000 N/mm2)       b) A

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd