4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Sucker deck principle for changeable depth bridge decks, Question What is t...

Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greate

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Installation of band drains, Question For drained reclamation, what wil...

Question For drained reclamation, what will significance of smear zone bring by installation of band drains ? Answer Throughout installation of band drains, smear zon

Explain the term - non-bonded prestressed concrete, Explain the term - Non-...

Explain the term - Non-bonded Prestressed Concrete It is a method of construction in which the tendons are not bonded to the concrete. Ducts, housing the tendons, are not grout

Why does the pressure increase under soil, Soil pressure enhances with dept...

Soil pressure enhances with depth due to the overburden or self-weight of the soil and because of loads imposed upon the soil. For example, the pressure variation below the dept

How to find back bearings?, Example: The following fore bearings were ...

Example: The following fore bearings were observed respectively for lines, AB, BC, CD, DE, EF and FG. Find out their back bearings: (i) 148°                          (ii

Calculate the concrete tensile strength, Calculate the concrete tensile str...

Calculate the concrete tensile strength A 6 in. by 12 in. concrete cylinder resisted a transverse force of 55,000-lbf, at 28 days, in a split tensile cylinder test. Calculate t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd