4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Design the curtain to touch the seabed, Question For fixing of silt cur...

Question For fixing of silt curtains, what is the reason that it does not desirable to design the curtain to touch the seabed ? Answer Silt finished are resistant ve

NERNST EQUATION, HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC

HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC

#title, how to convewrt wcb into rcb

how to convewrt wcb into rcb

Aggregaters, What Aggregate''s class III

What Aggregate''s class III

Calculate the flood discharg, Q. A bridge is to be constructed over a strea...

Q. A bridge is to be constructed over a stream having a catchment area = 20 miles 2 partly in plains and partly in hills. Portion in hills has a length of 1.7 miles and fall of 88

Formwork, slabs and beam formwork

slabs and beam formwork

Building classification, Why I is the missing after h and J is written in t...

Why I is the missing after h and J is written in the classification of building

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd