4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Main function of followers in driven h-piles, Question What is main fun...

Question What is main function of followers in driven H-piles ? Answer A follower is an extension between pile head and hammers which transfers blow to pile in which

Unloaded propped, Ask questa) In an unloaded propped cantilever, the proppe...

Ask questa) In an unloaded propped cantilever, the propped end sinks vertically relative to the fixed end by an amount ? due to poor construction of the foundation of the prop. Wha

What is stress corrosion, What is Stress Corrosion Stress corrosion ta...

What is Stress Corrosion Stress corrosion takes place in prestressed concrete tendons due to the combined actions of corrosion and static tensile stresses. This type of attack

Determine the elastic settlement of a rectangular foundation, Determine the...

Determine the elastic settlement of a rectangular foundation, 6 m × 12 m, on a uniform sand with E = 20,000 kN/m 2 and Poisson's ratio,   = 0.2. The contact pressure is 200 kN/m 2

In marine pile type of steel tubular piles, Question In marine pile typ...

Question In marine pile type of steel tubular piles with reinforced concrete infill, least toe level is frequently specified in contract drawings. What is the purpose in your v

Harbour layout, Harbour Layout: A harbour has the following constitue...

Harbour Layout: A harbour has the following constituent parts: (a)        An entrance channel, 100-300 m wide (b)       A turning basin, dia 400-600 m (c)        A b

Importance of geotextiles and sand in reclamation works, Question What ...

Question What is main importance of geotextiles and sand in reclamation works? Answer For geotextiles used in recovery, they serve mainly subsequent two purposes

Method to calculate the loss of prestress, Method to calculate the loss of ...

Method to calculate the loss of prestress When the consider creep in regard to loss of prestress, we have to see that the prestressed member is under compressive stresses due

Plot vertical displacement - cantilever beam, 1. The cantilever beam-like s...

1. The cantilever beam-like structure  shown below is modeled  using  a 2 x 10 mesh of rectangular four-node plane stress elements of equal size. Do the following and compare with

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd