construction material, Civil Engineering

Assignment Help:
4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

High and narrow beams, Question Give a reason that why are high and na...

Question Give a reason that why are high and narrow beams not desirable in concrete piers? Answer Supported on past experience in other, high and narrow beams after

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Explain the surface water treatment methods, Explain the Surface Water Trea...

Explain the Surface Water Treatment Methods A. Physical Unit Operations change in water quality is brought about through the application of physical forces screenin

SURVEYING, TYPES OF OBSTACLES IN CHAIN SURVEYING

TYPES OF OBSTACLES IN CHAIN SURVEYING

ENGlLISH, Ask question #WHAT is presentation skill #

Ask question #WHAT is presentation skill #

What will be the increase in horizontal thrust, A 9 metre high retaining wa...

A 9 metre high retaining wall retains a soil with the following properties: φ = 36°; γ = 18 kN/m 3 . What will be the enhance in horizontal thrust if the soil slopes up from the

Explain hydrology and evaporation, Explain Hydrology and Evaporation Hy...

Explain Hydrology and Evaporation Hydrology: Study of the circulation of water in nature.    Evaporation: Water in the liquid state transforms to vapor. Evaporation occurs f

Formation of holes in pipelines, Question While branch pipelines are co...

Question While branch pipelines are connected to pipelines, now and then Y-junctions or fitting branched pipelines to key pipelines by formation of holes in pipelines are u

Guidelines for selection of site, Guidelines for Selection of Site: Th...

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd