4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Construct the correct network for project, A project requires that activiti...

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can

Tests on bitumen, Tests on Bitumen: The following tests are conducted...

Tests on Bitumen: The following tests are conducted on bitumen to find its suitability as a road binder : (a) Penetration test (b) Softening Point test (c) Flash Poi

Curved surface profiles, Question Why is concrete profile barriers plan...

Question Why is concrete profile barriers planned with curved surface profiles ? Answer Safety fencings are designed to include vehicles in carriageway in that they a

Couple, Properties of a couple

Properties of a couple

Cumulative error, diffrence between cumilative compensative error

diffrence between cumilative compensative error

Define latitude - transportation, Define Latitude - Transportation Lati...

Define Latitude - Transportation Latitude of a line is the distance that the line extends in a north or south direction. A line that runs towards north has positive latitude; a

Cutting edge in well foundation, Q. Cutting edge in well foundation? Th...

Q. Cutting edge in well foundation? The function of cutting edge on well foundation is basically to cut through the earth which being sunk. The angle of well curb pushes the ea

Assignment, Need assignment for structure concrete work

Need assignment for structure concrete work

Sand layer underlying paving slab or interlocking blocks, Question What...

Question What is function of a sand layer underlying paving slab or interlocking blocks? Answer Normally after laying of sub-base layer of paving slab or interlocking

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd