4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Define the shrinkage limit and shrinkage ratio, The oven-dry weight of a pa...

The oven-dry weight of a pat of clay is 1.17 N and the weight of mercury displaced by it is 0.855 N. suppose the specific gravity of solids as 2.71, verify the shrinkage limit and

What is the specific gravity of the soil, An oven-dried soil weighing 1.89 ...

An oven-dried soil weighing 1.89 N is placed in a pyknometer which is then filled with water. The total weight of the pyknometer with water and soil is 15.81 N. The pyknometer fill

Classification of bricks based on their quality, Classification of Bricks B...

Classification of Bricks Based on their Quality The bricks used in construction are classified as following: First class bricks Second class bricks Third class bric

Insurance required to be incorporated in deal, Question Is procurement ...

Question Is procurement of third party insurance required to be incorporated in deal for construction works? Answer Purpose of third party insurance is to guard contra

Design an equalization basin with a safety factor, A storm occurs with rain...

A storm occurs with rain of varying intensity falling over a commercial area. The area has a combined sewer system. Two interceptor sewers direct flow to the wastewater treatment p

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Simple bending, In case of simple bending after simply supported beam, deri...

In case of simple bending after simply supported beam, derive that M/I = s /y = E/R.

Explain damage inspections - underwater inspection of bridge, Explain the D...

Explain the Damage inspections - underwater inspection of bridge? Sometimes referred to as post-event inspections, damage inspections are typically unscheduled inspections aime

Example of bars of varying cross section, Example of Bars of Varying Cross ...

Example of Bars of Varying Cross Section: In the numerical example under consideration δ = 750 × 300/( π/4) × 200 2 × 60 +750 × 400/(π/4) × 135 2 × 60 + 750 × 200/(π/4)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd