4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Calculate annual interest rate which is compounded monthly, You wish to buy...

You wish to buy a house and you can afford to make a down payment of $50,000. Your monthly mortgage payment cannot exceed $2,000. If 30-year loans are available at 7.5% annual inte

Meaning, i want the meaning of crete

i want the meaning of crete

Aggregaters, What Aggregate''s class III

What Aggregate''s class III

Determine the concept of shrink-fitting of metal tyres, Determine the conce...

Determine the concept of Shrink-fitting of metal tyres Shrink-fitting of metal tyres on the wheels of bullock carts is well known. As the hot metal tyre rings cool down, they a

Haley''s formula in pile driving, Question What is major difference bet...

Question What is major difference between "hammer efficiency" and "coefficient of restitution" at what time using Haley's formula in pile driving?   Answer Hammer ef

Comparing speed, Question Comparing speed of "Formwork exceeding 300mm wide...

Question Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at

What is meant by normally consolidated clay stratum, Determine what is mean...

Determine what is meant by normally consolidated clay stratum and over-consolidated clay stratum. Draw typical results of consolidation test data to a suitable plot relating the vo

Determine the flow velocity, Determine the flow velocity in 2,000 ft of 8 i...

Determine the flow velocity in 2,000 ft of 8 inch diameter piping flowing full. The energy lost in piping is 54 ft. Use nominal pipe diameter and C = 140.     Solution: Use v =

Types of pavements, Types of Pavements: On the basis of structural pe...

Types of Pavements: On the basis of structural performance of pavements, there are basically two types of pavements: (a) Flexible, and (b) Rigid. A flexible pavement

Calculate the change in volume, Calculate the change in volume: If the...

Calculate the change in volume: If the bar is 1 m long with rectangular cross section of 300 mm deep and 400 mm wide, compute the change in volume of the solid because of a lo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd