construction material, Civil Engineering

Assignment Help:
4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Example, slope deflection with settlement

slope deflection with settlement

Show the stresses during pile driving, Q. Show the Stresses during pile dri...

Q. Show the Stresses during pile driving? Stresses during pile driving In pile driving operation, proper selection of piling hammers is necessary to prevent the damage of

Explain rebound hammer - underwater non-destructive testing, Explain Reboun...

Explain Rebound Hammer - Underwater non-destructive testing? The underwater rebound hammer system is a surface hardness tester which can be employed to acquire a general condit

Determine the weight of one gallon of ferric chloride, The specific gravity...

The specific gravity of ferric chloride solution equals 1.3.  How much does one gallon of ferric chloride weigh?  Solution:  ρ ferric chloride /ρ water = 1.3       Conver

Strength of materials, Didtribution of shear stree over a triangular sectio...

Didtribution of shear stree over a triangular section

Analytical methods for pollutants under the clean water act, Analytical Met...

Analytical Methods for Pollutants Regulated Under the Clean Water Act? We suppose that you have knowledge of and access to the relevant analytical methods. These methods cover

Calculate the effective annual interest rate, A credit card advertises a no...

A credit card advertises a nominal rate of 18% compounded monthly. If no monthly payments are made, the effective annual interest rate is most nearly: The actual rate is, (18%

Define lead lag relationships - construction management, Define Lead Lag Re...

Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not

Curved beams, Sir how can we find location of neutral axis for a curved bea...

Sir how can we find location of neutral axis for a curved beam of circular cross section,,,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd