construction material, Civil Engineering

Assignment Help:
4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Determine the weight of solids mixed in the suspension, In a hydrometer ana...

In a hydrometer analysis, the corrected hydrometer reading in a 1000 ml uniform soil suspension at the start of sedimentation was 28. After a lapse of 30 minutes, the corrected hyd

Determine the limit state of serviceability, Determine the Limit State of S...

Determine the Limit State of Serviceability Cracking Cracking of concrete should not affect the appearance or durability of the structure. The criteria of limit state of cracki

List the significant engineering classification system, How do you distingu...

How do you distinguish among clay and silt in the field? State the purpose of identification and categorization of soils. List any three significant engineering classification syst

Reduced levelling, what is the theary of reduced levelling

what is the theary of reduced levelling

Maximum shear stress , the propane gas tank has an inner diameter of 1500mm...

the propane gas tank has an inner diameter of 1500mm and wall thickness of 15mm. If the wall is pressurized to 2MPa, determine the absolute maximum shear stress in the wall of tank

BRIDGES, WHAT ARE THE DIFFERENT TYPES OF BRIDGES

WHAT ARE THE DIFFERENT TYPES OF BRIDGES

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd