4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench pipe = 300 mm diameter.
o Width of trench = 600 mm o Depth of trench = 1000 mm o Bank m 3 = 2150 kg/ m 3 o Loose m 3 = 1935 kg / m 3

Related Discussions:- construction material

Doors, what is door and window sizes

what is door and window sizes

State the total rankine active thrust per metre run, A wall with a smooth v...

A wall with a smooth vertical back 9 m high ropes a purely cohesive soil with  c = 10 kN/m 2 and γ = 18 kN/m 3 . State the total Rankine active thrust per metre run, the positi

WMM, GRADATION OF WMM

GRADATION OF WMM

Assignment, Need assignment for structure concrete work

Need assignment for structure concrete work

Advantageous to use concrete of very high power, Question Will it advantag...

Question Will it advantageous to use concrete of very high power for example exceeding 60MPa? What are potential problems connected with high strength concrete ? Answer To in

Determine the interdependent phases of investigation, Determine the interde...

Determine the interdependent phases of investigation The following are the interdependent phases of investigation: i)  Stratigraphical survey, ii) Physical survey, and

Flow, what is maximum flood level

what is maximum flood level

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd