Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Electrodes- cast iron electrodes, Cast Iron Electrodes There are three ty...

Cast Iron Electrodes There are three types of electrodes for welding of cast ions. a) Monel-cored electrodes (30 % Ni 70 % Cu) b) Fe-Ni (40 % Ni) c) Ni-electrodes (97 E) These

Thermodynamic properties , Q= In an investigation of the thermodynamic prop...

Q= In an investigation of the thermodynamic properties of alpha-manganese,the following heat contents determined H 700  - H 298 = 2895 cal/g-atm H 1000 - H 298 = 5450 cal

Explain about the collapsible soils and subsidence, Collapsible Soils and S...

Collapsible Soils and Subsidence There are soils which are quite stable when dry and they show large volume changes on wetting under load. Examples of  these soils are loess (w

Explain the principle of screw conveyer, Explain the Principle of screw con...

Explain the Principle of screw conveyer When materials are feed into the fixed chutes, due to action of gravity of materials and the friction force between material and chute t

Determine the upward thrust, A vessel is in the shape of a truncated cone h...

A vessel is in the shape of a truncated cone having diameter of 1 meter at the top and 2 meter at the bottom and height 2 meter. If it is fully filled with water determine the upwa

Processing sequence for manufacturing coupling nut, Processing Sequence for...

Processing Sequence for Manufacturing Coupling Nut Referring to the Figure 12 below, we now illustrate the processing sequence for manufacturing coupling nut.

Equilibrium diagram, what do understand by the term equilibrium diagram

what do understand by the term equilibrium diagram

Determine the location of the hydraulic jumps - water depths, Problem: In H...

Problem: In HEC-RAS, model this system as 1 reach with cross-sections every 2 ft. For all 3 discharges (labeled as: design, low, flood), (a) Determine the water depths 10 ft fro

Pulsed dc welding, Pulsed DC Welding Pulsed DC involves the repetitive ...

Pulsed DC Welding Pulsed DC involves the repetitive variation in arc current from a background (low) value to a peak value. Adjustments of the pulse current time, background cu

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd