Construction activities for plant, Mechanical Engineering

Assignment Help:

Construction Activities for plant

Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Briefly explain model scale design, Q. Briefly explain Model scale design? ...

Q. Briefly explain Model scale design? Knowledge of dynamic similarity conditions enables evaluation of model scales. Almost alI the problems related to river hydraulics are ab

Theory of machine, analytical method for determining the acceleration and v...

analytical method for determining the acceleration and velocity?

Determine the location of the hydraulic jumps - water depths, Problem: In H...

Problem: In HEC-RAS, model this system as 1 reach with cross-sections every 2 ft. For all 3 discharges (labeled as: design, low, flood), (a) Determine the water depths 10 ft fro

Torque equilibrium equation , Problem A cat walks along a uniform plan...

Problem A cat walks along a uniform plank that is 5.00 m long and has a mass of 9.00 kg.  The plank is supported by two sawhorses, one 0.500 m from the left end of the board a

Determine the upward thrust, A vessel is in the shape of a truncated cone h...

A vessel is in the shape of a truncated cone having diameter of 1 meter at the top and 2 meter at the bottom and height 2 meter. If it is fully filled with water determine the upwa

Vernier caliper--measuring tools , Vernier Calipers: It is used to measure...

Vernier Calipers: It is used to measure internal as well as outer diameters of an object. There are separate jaws available for inside and outside diameter measurements. It can al

Calculate the feed in drilling operation, Calculate the feed in Drilling Op...

Calculate the feed in Drilling Operation Calculate the feed in m/min if a drill makes 200 revolutions per minute and penetrates to a distance of 3 mm per revolution. Solut

Subcontractor submittals, The Supplier/Subcontractor shall submit, for acce...

The Supplier/Subcontractor shall submit, for acceptance, their Material Traceability and PMI program and procedures, which shall comply with this specification, prior to the sourci

Explain about vertical vessels, Q. Explain about Vertical Vessels? Vert...

Q. Explain about Vertical Vessels? Vertical vessels shall normally be designed as self-supporting units, and shall resist overturn based upon wind or earthquake considerations.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd