Construction activities for plant, Mechanical Engineering

Assignment Help:

Construction Activities for plant

Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Explain the feature of screw conveyor, Explain the Feature of screw conveyo...

Explain the Feature of screw conveyor Screw conveyor has such feature as simple structure compact transverse dimension convenient maintenance enclosed delivery and small produc

Describe the working of a four stroke petrol engine, a) Describe main advan...

a) Describe main advantages and disadvantages of CI engine as compared to SI engine. b) With the help of a neat diagram, describe the working of a four stroke petrol engine.

Calculat ethe total amount of phase, Question 1 For an equilibrium cool...

Question 1 For an equilibrium cooled alloy of 92%D/8%C, which of the above diagrams best represents the microstructure at 0°C? Question 2 For an equilibrium cooled allo

Compute monitoring and control, Compute Monitoring and Control: These are t...

Compute Monitoring and Control: These are the direct application in which the computer is connected directly to the manufacturing process for the purpose of monitoring or contr

POLITICS, WHO IS HOME MINISTER OF INDIA OF 2014?

WHO IS HOME MINISTER OF INDIA OF 2014?

Program evaluation and review techniques, Program Evaluation and Review Tec...

Program Evaluation and Review Techniques: The Rola and Cola Corporation is a professional II nursing home aspiring to become I nursing home. It desires to provide the ultimate

Evaluate the angular velocity, In a 4-Bar process the following data is giv...

In a 4-Bar process the following data is given :- Length of crank (AB) = 300 mm, Length of link AD = 600 mm, Length of links BC = CD = 360 mm, Angle BAD ie ∠BAD = 60o ,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd