Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Wilson hartnell governor, how to design and fabricate wilson hartnell gover...

how to design and fabricate wilson hartnell governor?

Cam, advanced cam profile synthesis

advanced cam profile synthesis

Applications of Numerical Methods in Mechanical Engineering, Various applic...

Various applications of numerical methods in the field of m=numerical engineering.

Heat, how to prove heat is a path function?

how to prove heat is a path function?

Maintenance operations, Maintenance Operations: The maintenance opera...

Maintenance Operations: The maintenance operations cover various activities such as: (a) making good rain cuts in embankment, (b) clearing the side ditches of vegetatio

Essence of second law - thermodynamics, Essence of Second Law: Sol: ...

Essence of Second Law: Sol: First law deals with conservation and conversion of energy. But it fails to state the conditions under which the energy conversion are possible.

Design a cam profile, A cam is required to a lift of 30 mm for a rotation r...

A cam is required to a lift of 30 mm for a rotation range of 60 o . The follower then dwells at this level for a further 90 o and then falls over the next 60 o . Finally the rest

Heat content , is it correct tosay tha the heat content of the system is 5 ...

is it correct tosay tha the heat content of the system is 5 kv.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd