Construction Activities for plant

Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Maximum permissible stress in belt, Maximum permissible stress in belt: ...

Maximum permissible stress in belt: Q: A belt 100mm wide and 8.0mm thick are transmitting power at belt speed of 160m/minute.  The angle of lap for smaller pulley is 165º an

Computer integrated manufacturing, the component of computer integrated man...

the component of computer integrated manufacturing with the diagram

Wrking cran, this is a problem for designing wrecking crane. there are 2 sc...

this is a problem for designing wrecking crane. there are 2 scenarios, one is when ball is held and one where its at maximum. i calculated the loads and now need to find the follow

Determine initial tension in the belt, A flat belt, 8 mm thick and 100 mm w...

A flat belt, 8 mm thick and 100 mm wide transmits power between two pulleys, running at 1600 m/min. The mass of the belt is 0.9 kg/m length. The angle of lap in the smaller pulle

2 degree freedom of system, A mechanical System (two degrees of freedom sys...

A mechanical System (two degrees of freedom system) is represented by the following two differential equations: m1x"1+(k1+k2)x1-k2x2=0 m2x"2-k1x1+(k2+k3) x2=0 Given m1=m2=0.5kg, k

Distribution of circumferential stress intensity, A thick cylinder 125 mm i...

A thick cylinder 125 mm inside diameter and 250 mm outside diameter is subjected to an internal fluid pressure of 50N/mm 2 . Determine the maximum and minimum intensities of circum

Briefly explain model scale design, Q. Briefly explain Model scale design? ...

Q. Briefly explain Model scale design? Knowledge of dynamic similarity conditions enables evaluation of model scales. Almost alI the problems related to river hydraulics are ab

Withworth quick return mechanism, its definition, principle, explanation, a...

its definition, principle, explanation, application, and a diagram

What are main important terms included in the footings, What are main impor...

What are main important terms included in the footings? Term included in the footings: a. described different types of footings and the process of selecting each type, b.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd