Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Refractory, extraction of refractories

extraction of refractories

Fluid Mechanics, temperature lapse rate differentiation integration...

temperature lapse rate differentiation integration...

Conduction of electricity in gases, CONDUCTION OF ELECTRICITY IN GASES ...

CONDUCTION OF ELECTRICITY IN GASES Electricity can pass through different media. In the case of gases, the atoms or molecules are not packed and they are free to move. In fact

Building a fermenter for a new product, The first stage of design assumes: ...

The first stage of design assumes: budget is approved, marketing research is complete, product can be made at a price below that which it can be sold, research and development is c

Evaluate the stresses in the steel and concrete bars, A load of 2MN is appl...

A load of 2MN is applied on a short concrete column 500 mm x 500 mm. The column is reinforced with four steel bars of 10 mm diameter, one in each corner. Evaluate the stresses in t

Mechanical design, The second stage of the design process is to evaluate th...

The second stage of the design process is to evaluate the oxygen requirement for the organism. This is necessary so that we can establish if the vessel we construct will be capable

Organisation set-up - construction of railway line, Organisation set-up: ...

Organisation set-up: The civil engineering department of the Railways is responsible for the maintenance of railway lines. The maintenance organisation consists of Chief Engi

Magnetic susceptibility and ferromagnetic substances, Magnetic Susceptibili...

Magnetic Susceptibility and Ferromagnetic Substances: Magnetic Susceptibility: The magnetic susceptibility (c) of a substance is defined  as the ratio of the intensity of magn

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd