Construction Activities for plant

Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as part of the design.

The primary hazard of trenching and excavation is employee injury from collapse. An excavation design shall include adequate sloping and benching or adequate support and protective system to protect personnel during the construction activities. Soil analysis is an important part of determining the appropriate sloping, benching and shoring. An added hazard exists if excavation extends below the groundwater table.

A number of features need to be addressed during the plant layout including crane access to equipment and drop areas, height of crane to accommodate the size and shape of items to be lifted, clearance over other facilities and sling allowance, personnel access to gantry, and size of buffers and structural steel to accommodate loadings.

Lifting of heavy equipment into place by crane may require the construction of specific foundations or lift pads. Rigging requires careful evaluation of slings for use because of the wide variety of safety factors which must be considered for each case. These factors include but are not limited to:

• Size and type of sling.

• The method of fastening.

• Sheaves, sprockets, and drums.

• Condition of equipment or material.

• Size and shape of load.

• Type of attachment.


Related Discussions:- Construction activities for plant

Clearance volume, Clearance Volume ( V C ) : The nominal volume of the c...

Clearance Volume ( V C ) : The nominal volume of the combustion chamber above the piston when it is at the top dead centre is the clearance volume. It is designated as V C an

Occupational health problems, Occupational Health Problems Various he...

Occupational Health Problems Various health problems have been found to be rooted in type of work, equipment and Workplace. It was eighteenth century while definite observati

Mechanisms of machines, slidder crank chain / reciprocating engine mechanis...

slidder crank chain / reciprocating engine mechanism pics

Preliminary stress analysis, Preliminary stress analysis work will start ea...

Preliminary stress analysis work will start early in the detail engineering phase after completion of equipment layout and piping study drawings. The piping required to be analyzed

Use of high temperature material in superheaters, Q. Use of High temperatur...

Q. Use of High temperature material in Superheaters? Typically superheaters and reheaters provide service lives of approximately 15 years (i.e. half the expected service life o

Hot service insluation thicknesses, Q. Hot Service Insluation Thicknesses? ...

Q. Hot Service Insluation Thicknesses? Hot Service Insluation Thicknesses are specified based on the following design criteria: • Average Annual Climatic Conditions:

Rotary converters, ROTARY CONVERTERS Historically, these type of power so...

ROTARY CONVERTERS Historically, these type of power sources were developed first for arc welding applications and even now these types are popular. These rotary converters are of

Explain the non-linear sweep, Non-linear Sweep In non-linear sweep, the...

Non-linear Sweep In non-linear sweep, the path is a curve described by a higher-order equation (quadratic, cubic or higher)

Lacashire boiler, LACASHIR E BOILER : It is fire tube, internally ...

LACASHIR E BOILER : It is fire tube, internally fired, stationary, horizontal, natural circulating type boiler. Evaporative capacity can be up to 8500 kg/hr. and can opera

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd