Constriction of waterway at bridges, Civil Engineering

Assignment Help:

Q. Constriction of waterway at bridges?

Constriction of waterway at bridges is effected by extending the approach banks to cover spill area or, in addition, part of active channel. Such encroachment causes obstruction to flow. Guide bunds are then required to be provided for guiding flow smoothly through the bridge.

The course of main channel may change on account of progressive movement of meanders or formation and movement of islands in braided rivers. In the process, attack may develop on bridge approaches. Under such conditions it becomes obligatory to provide guide bunds in order to pass the river discharge axially with as uniform flow distribution through the bridge as possible. Guide bunds also prevent the river cutting into the bridge approaches, causing breaches and forming deep scour at abutments. These objectives are achieved by giving guide bunds suitable shape, providing adequate length, by adding curved heads and by giving suitable protection to exposed faces against river attack.


Related Discussions:- Constriction of waterway at bridges

Dam, how can i prepare a project on dam

how can i prepare a project on dam

Surveying, explain operations of direct and indirect leveling?

explain operations of direct and indirect leveling?

Usage of double air valves and single air valves, Question In designig ...

Question In designig of watermains, how to decide usage of double air valves and single air valves ? Answer Single air control device let squeezing air out of p

Explain the bernoulli energy equation, Explain the Bernoulli Energy Equatio...

Explain the Bernoulli Energy Equation Accounts for the fluid energy at any point in a fluid flow system. Units are in ft. Developed for energy without friction. The total energ

Shrinkage of concrete in prestressed members, Shrinkage of concrete in pres...

Shrinkage of concrete in prestressed members The shrinkage of concrete in prestressed members results in a shortening of ensioned wires and hence contributes to the loss of st

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Steping footing, What are the types of foundation. With figure

What are the types of foundation. With figure

Moisture content, What is moisture content for road work

What is moisture content for road work

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd