Q. Constriction of waterway at bridges?

Constriction of waterway at bridges is effected by extending the approach banks to cover spill area or, in addition, part of active channel. Such encroachment causes obstruction to flow. Guide bunds are then required to be provided for guiding flow smoothly through the bridge.

The course of main channel may change on account of progressive movement of meanders or formation and movement of islands in braided rivers. In the process, attack may develop on bridge approaches. Under such conditions it becomes obligatory to provide guide bunds in order to pass the river discharge axially with as uniform flow distribution through the bridge as possible. Guide bunds also prevent the river cutting into the bridge approaches, causing breaches and forming deep scour at abutments. These objectives are achieved by giving guide bunds suitable shape, providing adequate length, by adding curved heads and by giving suitable protection to exposed faces against river attack.


Related Discussions:- Constriction of waterway at bridges

Offset(survey)., what is meant by the offsets and explain its type?

what is meant by the offsets and explain its type?

Draw the shape of the pressure line, Draw the shape of the Pressure line. ...

Draw the shape of the Pressure line. Solution The locations of resultant force at sections A-A, B-B  and C-C have already been determined. Joining these locations, we can dr

Define the meaning of circular prestressing, Define the meaning of circular...

Define the meaning of circular prestressing In circular prestressing, tendon wires are wrapped under tension over the concrete pipes which are pre-cast. The tension in the ten

What do you mean by depth of scour, Q. What do you mean by Depth of Scour? ...

Q. What do you mean by Depth of Scour? The maximum scour depth in a stream can be ascertained when ever possible by actual sounding at or near the site proposed for the bridge

What is the required bracing location for the beam, A contractor has select...

A contractor has selected a W14x74 simply supported beam for a high rise construction project.  The span length for the provided beam is set at 30 feet.  The maximum factored appli

Materials that provide a path to the magnetic flux are , Materials that pro...

Materials that provide a path to the magnetic flux are? Answer: These are magnetic materials

Edge piles take up more loads than central piles, Edge piles take up more l...

Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd