Question
What is load transfer mechanism for paving blocks in pedestrian footway?
Answer In Hong Kong, footway is as a rule designed with paving slabs or interlocking blocks in its place of concrete since extensive use of concrete in pavement is boring. In addition poor appearance will result in concrete pavement due to recurrently trench openings for utility work. In adding up, owing to prolonged setting and curing time of concrete, use of concrete pavement inevitably generates trouble to the general public. Pedestrian loads are taken up from side to side following ways-
(i) Load transport capacity of paving slabs/ interlocking blocks are derived from their individual power (ii) Pedestrian loads are as well supported by interlocking forces provided by friction transfer through sand in vertical joints
some expansion joint(10 mm- 20 mm) on my basement roof.rain water leakage in basement i want the solution of expiation joint and water leakes.
Formula of the included angle of the bearings?
WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD IN LEVELLING?
• The previous load analysis represents a first and necessary step in the analysis of the given structure but it does not tell us whether the given load can be safely supported (i.
Explain the Non Destructive Inspection Steel/Cast Iron Substructures Some of the structural defects in steel structures may not be visible during visual inspection. In that eve
A clay stratum is 4.5 m thick and rests on a rock surface. The coefficient of consolidation of a sample of this clay was found to be 4.5 × 10-8 m 2 /s in the laboratory. Verify pro
how to remove dampness in mud houses?
Q. What do by Diaphragm wall? For the construction of diaphragm walls adjacent to buildings, former experience showed that excess slurry head above groundwater level had to be
what is the purpose of 6mm ms sheet for staining in various conditions at inner &outer of well
A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd