load transfer mechanism, Civil Engineering

Assignment Help:

Question

What is load transfer mechanism for paving blocks in pedestrian footway?

Answer

In Hong Kong, footway is as a rule designed with paving slabs or interlocking blocks in its place of concrete since extensive use of concrete in pavement is boring. In addition poor appearance will result in concrete pavement due to recurrently trench openings for utility work. In adding up, owing to prolonged setting and curing time of concrete, use of concrete pavement inevitably generates trouble to the general public.

Pedestrian loads are taken up from side to side following ways-

(i) Load transport capacity of paving slabs/ interlocking blocks are derived from their individual power

(ii) Pedestrian loads are as well supported by interlocking forces provided by friction transfer through sand in vertical joints

 


Related Discussions:- load transfer mechanism

Expansion jiont, some expansion joint(10 mm- 20 mm) on my basement roof.rai...

some expansion joint(10 mm- 20 mm) on my basement roof.rain water leakage in basement i want the solution of expiation joint and water leakes.

RISE AND FALL METHOD, WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD...

WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD IN LEVELLING?

Stress analysis, • The previous load analysis represents a first and necess...

• The previous load analysis represents a first and necessary step in the analysis of the given structure but it does not tell us whether the given load can be safely supported (i.

Non destructive inspection steel/cast iron substructure, Explain the Non De...

Explain the Non Destructive Inspection Steel/Cast Iron Substructures Some of the structural defects in steel structures may not be visible during visual inspection. In that eve

Determine the probable period of time, A clay stratum is 4.5 m thick and re...

A clay stratum is 4.5 m thick and rests on a rock surface. The coefficient of consolidation of a sample of this clay was found to be 4.5 × 10-8 m 2 /s in the laboratory. Verify pro

Damp proofing, how to remove dampness in mud houses?

how to remove dampness in mud houses?

What do by diaphragm wall, Q. What do by Diaphragm wall? For the constr...

Q. What do by Diaphragm wall? For the construction of diaphragm walls adjacent to buildings, former experience showed that excess slurry head above groundwater level had to be

Well foundation in bridges, what is the purpose of 6mm ms sheet for stainin...

what is the purpose of 6mm ms sheet for staining in various conditions at inner &outer of well

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd